PROPANE PRACTICE TESTS
_________ shall be resistant to the action of liquefied petroleum gas or to any other chemical
constituents of the gases to be conducted through the piping. - questions and answers-Thread
compound
__________ shall have a vertical clearance above the cooking top of NOT less than 30 inches
to combustible material or metal cabinets. - questions and answers-Household cooking
appliances
__________ shall NOT be installed in or attached to walls of combustible material unless listed
for such installation. - questions and answers-Wall-type room heaters
__________ shall NOT be used for metallic pip and tubing. - questions and answers-Cast iron
pipe fittings
___________ is permitted for piping. - questions and answers-Wrought iron pipe
___________ shall be located so as NOT to interfere with proper circulation of combustion,
ventilation, and dilution air. - questions and answers-Appliances
___________ shall close when the flow is either stopped or reversed. - questions and
answers-Back flow check valves
___________ shall NOT be used for upper and lower casings of regulators. - questions and
answers-Non-metallic parts
____________ are appliances that are constructed and installed so that all air for combustion is
derived directly from the outside atmosphere and all flue gases are discharged outdoors. -
questions and answers-Direct vent appliances
____________ is gas piping that, when in place in a finished building, would require removal of
permanent construction to gain access to the piping. - questions and answers-Concealed piping
____________ or other means shall be provided to minimize the possibility of the entrance of
water or other extraneous matter into the relief device or any discharge piping. - questions and
answers-Rain caps
____________ shall NOT be located between a pressure relief device and the container unless
a listed PRV manifold is used. - questions and answers-Shutoff valves
____________ shall NOT be used to test for gas leakage. - questions and answers-Matches,
candles, or open flames
,A ___________ for medium-heat equipment shall extend at least 10 ft higher than any portion of
any building with 25 ft. - questions and answers-Chimney
A ___________ is a compartment or chamber to which one or more ducts are connected and
that forms part of the air distribution system. - questions and answers-Plenum
A ___________ shall be installed in each section of piping and hose in which liquid LP-Gas can
be isolated between shutoff valves so as to relieve the pressure that could develop from the
trapped liquid to a safe atmosphere or product retaining section. - questions and
answers-Hydrostatic relief valve
A ____________ is required for a person actively in charge of LP Gas operation. - questions
and answers-Class X Manager's Permit
A 350 gallon container installed alongside a building that has an overhang extending 5.5 feet
from the building shall be ________ from the portion that projects out from the building. -
questions and answers-5 feet
A chimney for residential type or low heat appliances shall extend at least 2 feet higher than any
portion of a building within a horizontal distance of _______. - questions and answers-10 feet
A chimney for residential-type gas appliances shall extend at least ___________ above the
highest point where it passes through a roof of a building. - questions and answers-3 feet
A chimney shall extend at least _________ above the highest connected equipment draft hood
outlet or flue collar. - questions and answers-5 feet
A class X manager shall be considered to be actively supervising if such a manager is present
at the separate branch or base of operation at least ________ of the reasonably normal hours
of operation. - questions and answers-50%
A container to be abandoned underground shall be filled with __________ or purged with an
inert gas. - questions and answers-Water OR Sand OR Foamed plastic
A cylinder shall ________ if it is NOT suitable for continued service. - questions and
answers-NOT be filled
A cylinder with a (an) ____________, even if it appears to be undamaged, shall NOT be refilled
until it is requalified by the methods prescribed in DOT regulations. - questions and
answers-Expired requalification date
, A draft hood shall be located so its relief opening is NOT less than ___________ from any
surface except that of the appliance it serves and the venting system to which the draft hood is
connected. - questions and answers-6 inches
A gas vent extending through an exterior wall shall NOT terminate adjacent to the wall or below
______________. - questions and answers-Eaves or Parapets
A listed __________ shall be installed at the discharge end of the transfer hose at vehicle fuel
dispensers. - questions and answers-Quick-acting shutoff valve
A new piping system may NOT be tested with _________. - questions and answers-Oxygen
A pressure test shall NOT be less than __________ regardless of design pressure. - questions
and answers-3 psig
A score of ___________ correct shall be a passing grade for all examinations. - questions and
answers-80%
A single 1,000 gallon water capacity aboveground container may be installed ____________
from a building if the container is at least 25 feet from any other LP-gas container of more than
125 gallons w.c. - questions and answers-10 feet
A system being leak tested should show no increase or decrease in the pressure reading for a
period of ______________. - questions and answers-3 minutes
A type B-W gas vent shall terminate at least _______ in vertical height above the bottom of the
wall frame. - questions and answers-12 feet
A vent connector shall be installed without any dips or sags and shall slope upward at least
____________. - questions and answers-1/4 inch per foot
A vent connector shall NOT be connected to a chimney flue serving a fireplace unless the
fireplace flue opening is _____________. - questions and answers-Permanently sealed
A vertical distance of NOT less than ______ shall be provided between the top of all food
service hot plates and griddles and combustible material. - questions and answers-48 inches
A water heater installation shall be provided with _______________. - questions and
answers-Over temperature protection and overpressure protection
Aboveground containers 501 to 2,000 gallons water capacity shall be located __________ from
a building. - questions and answers-25 feet
Aboveground containers shall be ________. - questions and answers-Painted
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller lizmwikali72. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.