Net Present Value (NPV) - Answer-the difference between the present value of a project's future cash flows and its cost. Estimating cost is usually straight forward; however, estimating future cash flows can be tricky. discounted cash flow (DCF) valuation - Answer-finding the market value of assets or their benefits by taking the present value of future cash flows EX: estimating what the future cash flows would trade in for in today's dollars What is the Benefit of NPV? - Answer-It measures the magnitude, timing, and risk of Cash flows, which further illustrates its link to the firm's stock price What happens if NPV0? - Answer-Then accepting the project creates value. So to maximize value, choose projects with the HIGHEST NPV. Payback Period - Answer-length of time until the accumulated cash flows equal or exceed the original investment Payback Period Rule - Answer-Investment is acceptable if the calculated payback is less than some prespecified number of years Advantages of Payback Period - Answer-Easy to Understand, Adjusts for the Uncertainty of later cash flows, Biased towards liquidity Disadvantages of Payback Period - Answer-Ignores the time value of money, Requires an arbitrary cutoff point, Ignores cash flows beyond the cutoff date, Biased against long-term projects The Discounted Payback Period Advantages - Answer-All of the simple payback rule plus time value of money (at least for cash flows prior to the cutoff), If a project pays back on a discounted basis, and has all positive cash flows after the initial investment, then it must have a positive NPV Disadvantages Discounted Payback Period - Answer-The arbitrary cut-off period may eliminate projects that would increase firm value, If there are negative cash flows after the cut-off period, the rule may indicate acceptance of a project that has a negative NPV Internal Rate of Return (IRR) - Answer-The rate that makes the present value of the future cash flows equal to the initial cost or investment. In other words, the discount rate that gives a project $0 NPV

Meer zien Lees minder
Instelling
FIN701
Vak
FIN701

Voorbeeld van de inhoud

Finance 701 Exam Study Guide Questions
and Answers
Net Present Value (NPV) - Answer-the difference between the present value of a
project's future cash flows and its cost. Estimating cost is usually straight forward;
however, estimating future cash flows can be tricky.

discounted cash flow (DCF) valuation - Answer-finding the market value of assets or
their benefits by taking the present value of future cash flows EX: estimating what the
future cash flows would trade in for in today's dollars

What is the Benefit of NPV? - Answer-It measures the magnitude, timing, and risk of
Cash flows, which further illustrates its link to the firm's stock price

What happens if NPV>0? - Answer-Then accepting the project creates value. So to
maximize value, choose projects with the HIGHEST NPV.

Payback Period - Answer-length of time until the accumulated cash flows equal or
exceed the original investment

Payback Period Rule - Answer-Investment is acceptable if the calculated payback is
less than some prespecified number of years

Advantages of Payback Period - Answer-Easy to Understand, Adjusts for the
Uncertainty of later cash flows, Biased towards liquidity

Disadvantages of Payback Period - Answer-Ignores the time value of money, Requires
an arbitrary cutoff point, Ignores cash flows beyond the cutoff date, Biased against long-
term projects

The Discounted Payback Period Advantages - Answer-All of the simple payback rule
plus time value of money (at least for cash flows prior to the cutoff), If a project pays
back on a discounted basis, and has all positive cash flows after the initial investment,
then it must have a positive NPV

Disadvantages Discounted Payback Period - Answer-The arbitrary cut-off period may
eliminate projects that would increase firm value, If there are negative cash flows after
the cut-off period, the rule may indicate acceptance of a project that has a negative NPV

Internal Rate of Return (IRR) - Answer-The rate that makes the present value of the
future cash flows equal to the initial cost or investment. In other words, the discount rate
that gives a project $0 NPV

, IRR Decision Rule - Answer-The investment is acceptable if its IRR exceeds the
required return

Mutually Exclusive Investment Decisions - Answer-Taking one project means another
cannot be taken

Independent Decision - Answer-A given project can be taken in conjunction with other
projects. Accept all that meet the minimum criteria.

Problem 1: Investing or Financing? - Answer-If the cash flows are of loan type, meaning
money is received at the beginning and paid out over the life of the project, then the IRR
is really a borrowing rate, and lower is better

Problem 2: Multiple IRRS
Non-Conventional Cash Flows - Answer-The sign of the cash flows changes more than
once (or, as above, the cash inflow comes first and outflows come later)

What is one method to eliminate multiple IRRs? - Answer-Modified Internal Rate of
Return (MIRR)

Modified IRR - Answer-Discount all cash outflows to the present, and compound all
cash inflows to the last period of the project. Then, the find the rate that equates the
values. The discounting and compounding can be done at different borrowing and
investment rates, respectively.

Problems Specific to Mutually Exclusive Projects - Answer-Problem 1: Scale
IRR does not account for the amount of total value created, only a percentage return.
Problem 2: Timing

NPV and IRR Comparison: - Answer-If a projects cash flows are conventional (costs are
paid early and benefits are received over the life), and if the project is independent, the
NPV and IRR will give the same accept or reject signal.

Profitability Index (PI) - Answer-Present value of future cash flows divided the initial
investment

What happens to the PI if there is a positive NPV? - Answer-The PI will be greater than
1

Relevant Cash Flows - Answer-Cash flows that occur (or do not occur) because a
project is undertaken. Cash flows that will occur whether or not we accept a project are
not relevant.

Incremental Cash Flows - Answer-Any and all changes in the firm's future cash flows
that are a direct consequence of taking the project.

Geschreven voor

Instelling
FIN701
Vak
FIN701

Documentinformatie

Geüpload op
23 augustus 2024
Aantal pagina's
7
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
lectknancy Boston University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
301
Lid sinds
2 jaar
Aantal volgers
28
Documenten
26007
Laatst verkocht
4 dagen geleden

3.7

69 beoordelingen

5
31
4
12
3
11
2
4
1
11

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen