100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
SAP S Question and answers already passed 2024 $17.49   Add to cart

Exam (elaborations)

SAP S Question and answers already passed 2024

 6 views  0 purchase
  • Course
  • TS 410
  • Institution
  • TS 410

SAP S Question and answers already passed 2024 SAP S/4HANA Full List (TS410 Exam) What are the scope of a planning run? - correct answer -Regenerative Planning -Net Change for Total Horizon What is the purpose of Material Ledger? - correct answer -the elimination of locking and increase ...

[Show more]

Preview 4 out of 38  pages

  • August 24, 2024
  • 38
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • sap s
  • TS 410
  • TS 410
avatar-seller
Carzola98
SAP S/4HANA Full List (TS410 Exam)
What are the scope of a planning run? - correct answer ✔-Regenerative
Planning
-Net Change for Total Horizon


What is the purpose of Material Ledger? - correct answer ✔-the elimination
of locking and increase throughput for standard pricing for material valuation
-improved and flexible valuation methods in multiple currencies and parallel
accounting


What is the output of an MRP run? - correct answer ✔-Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items


What is the master data need for Adv. Planning? - correct answer ✔-
Location
- Product
- Resource


List the Options for Running MRP? - correct answer ✔- Total Planning
- Single Item Planning Multilevel
- Single Item Planning Single Level
- Single Item Planning Interactive


What is the difference between the stock requirements list and the MRP list? -
correct answer ✔Stock Req - Real Time / Dynamic

,MRP List - Static / Frozen


What is the difference between MRP and Consumption Based Planning? -
correct answer ✔MRP - planned on requirements (future, current, forecast)
CBP - planning on historical data (historical)


What does a work center control? - correct answer ✔Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types


What is the result of a completion confirmation? - correct answer ✔-
Progress of the order / status update
- GR partial or final
- Time Activity Update
- Scrap leftover material


What happens, on the Stock Requirements List, when a planned order is
converted to a production order for the finished product: - correct answer ✔-
planned order converts to production order
- BOM + routing is copied from planned order to production order


What happens, on the Stock Requirements List, when a planned order is
converted to a production order for the components: - correct answer ✔-
reservations for dependent components

,What is a standard cost estimate used for? - correct answer ✔-Determine
the sales price
- Update the standard price in material master
- Calculate the planned cost in a production order


What is a work center? - correct answer ✔- type of time (days, hours)
- where
- who
- identifies the resources
- formula calculations


Describe each of the different types of goods movements. - correct answer
✔- GR
- GI
- Stock Transfer / Transfer Posting


What is a routing? - correct answer ✔Sequence of steps to complete the
work
Quantity of time to complete the work


What transactions debit a production order? - correct answer ✔GI
Confirmation
External Processing
Overhead
Direct FI Postings

, What transactions credit a production order? - correct answer ✔GR
Settlement


How is a Stock Transport Order used to complete a stock transfer? - correct
answer ✔GI for sending plant
GR for receiving plant


What is the difference between a one step and a two-step stock transfer? -
correct answer ✔Authorizations needed to complete step
Number of Documents
Level of Control


List the solutions of the SAP S4 HANA Suite - correct answer ✔Ariba
Concur
Successfactors
Fieldglass
Hybris


List the key innovations developed for SAP S4 HANA - correct answer
✔MRP
Inv Management
Material Valuation
Capacity Planning
Available to Promise and Backorder Processing
Order Management and Billing
Procurement

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Carzola98. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77016 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.49
  • (0)
  Add to cart