Before developing a project plan, it is important to (CH3) Answer - have a clear
understanding of the scope of work
A scope statement should include: (CH3) Answer - Both in-scope and out-of-
scope items
The key elements of a project should be driven by: (CH3) Answer - the client's
need
What is a dependency within a project task schedule? (CH3) Answer - A task
that cannot begin before another task has been completed
Project budget refers to what? (CH3) Answer - The amount of labor and
materials the project manager has allocated to complete the project.
A primary reason for attending construction meetings is to: (CH3) Answer -
Identify changes to the original design that will affect the av installation.
In the event of a change in the placement of air-conditioning ducts in a
boardroom, which of the following documents should the AV integrator submit
first? (CH3) Answer - RFI
Which of the following documents should an AV integrator submit in the event
that a manufacturer has discontinued a projector model? (CH3) Answer - RFC
, The ANSI/INFOCOMM 2M-2010 Standard Guide for AV Systems Design and
Coordination Process lays out a procedure for determining the_________ (CH3)
Answer - project communication that needs to take place on a given project.
After which of the following activities is an AV project completed? (CH3)
Answer - System closeout activities are completed
Which set of drawings should you reference to view the ductwork that goes
through the building? Answer - Mechanical Drawings
Which set of drawings should you reference to locate a power outlet for a
video display? Answer - Electrical Drawings
Which of the following must the as-built drawings show? Answer - Details of
the system as finally installed
OFOI Answer - Owner Furnished Owner Installed (you will not need to install)
What does an elevation flag on a plan drawing indicate? Answer - Related
elevation drawings
What type of drawing would you use to find out exactly how the projector
should be mounted to the ceiling? Answer - Detail Drawing
Which of the following is the AV team likely to perform during new
construction? Answer - • Install sprinkler system
• Run cables and install mounts - Answer
• Mount drop ceiling
• Build the firewall