Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Foreman Certification Practice Test|127 Q’s and A’s (UA Local 469 Foreman Certification Practice Test Flash Cards)

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
25-08-2024
Written in
2024/2025

Foreman Certification Practice Test|127 Q’s and A’s (UA Local 469 Foreman Certification Practice Test Flash Cards)

Institution
Course

Content preview

Foreman Certification Practice Test|127
Q’s and A’s (UA Local 469 Foreman
Certification Practice Test Flash Cards)
If a foreman from a different trade approaches you claiming that one of your
crew members has been injured while working outside of his scope of work,
what would be the FIRST action you should take? - -Get the crew member
medical attention.

-Which of the following is a true statement with respect to a foreman 's
responsibility related to his or her crew? - -The foreman is responsible for
anything that occurs at the jobsite from the beginning of the work day/shift
to the end of the work day/shift.

-Why is preparation so important in a negotiation? - -Having time to prepare
and having a plan makes it easier to keep emotions in check.

-The piping specifications required all wall penetrations to have a steel pipe
sleeve.The steam piping size is 4 inches SCH 80 carbon steel with 1 inch of
fiberglass insulation. What diameter of SCH 40 carbon steel sleeve is the
minimum that you can use? - -8 inches

-A member of your crew is being excessively loud and using inappropriate
language. As a foreman, what is the MOST effective course of action to take?
- -Explain to them that their behavior is inappropriate and may be
considered harassment by fellow crew members and by management

-What is the purpose of a separation notice? - -The purpose of a separation
notice is to identify the circumstances surrounding a termination.

-With which of the following costs should a foreman be MOST concerned? - -
Labor

-A(n) ________________ occurs when any condition or document modifies the
work as defined in the contract documents during the bidding process. - -
Change Order

-On a project that requires 100% tie-off for elevated work, how many
lanyards are required on a full body harness? - -2

-The client is not happy with part of the project and wants to make a
change. What actions should you take to ensure the client is happy while
ensuring that progress on your job continues? - -Stop working on that
portion of the job that is at issue and contact your supervisor.

, -Using drawing, what is the elevation of the top of the 24 x 18 duct? - -31
feet and 10 inches.

-On the project blueprint there is a bank of four pipe runs with each pipe
measuring three inches in diameter which measure 12 inches in length on
the blueprint. The scale used on the blueprint is 1/4 inch equals 1 foot. How
many feet of 3 inch pipe should be ordered to complete the runs? - -192 feet

-Using the formula below, what is the correct 45 offset when you have a
rolling offset where the roll is 8 inches and the rise is 6 inches? Formula:
Offset = roll 2 + rise2 - -10 inches.

-What is the first rule of negotiation? - -Understand the other person's
needs.

-Assume that you need to purchase 1,000 feet of pipe for your assigned
project. If pipe costs $1.25 per foot, what is the cost of purchasing 40% of
the total pipe needed? - -$500

-Which of the following describes the purpose of "Short Interval Planning? "
or "Look Ahead Planning"? - -Breaking the job into small manageable pieces.

-Which of the following correctly identifies what is included in legitimate
labor costs? - -Hourly wages, fringe benefit packages, payroll taxes,
insurance and safety costs,and small tools and consumables.

-Calculate the number of hangers needed to support 275 feet of pipe if you
need a hanger placed every 8 feet? - -35 hangers

-The bid documents associated with your project state, "Do not remove or
disturb any asbestos containing material (ACM). " You have three days
before a planned outage/shutdown to remove a 12-inch insulated gate valve
that you suspect has an asbestos covering. What should you do? - -Contact
your supervisor for proper procedures and instructions on how you should
proceed.

-When is it best to perform site safety inspections? - -Every day that work is
in progress.

-Using Figure 2, what is the elevation of "U" ? - --0 feet and 6 inches.

-Which of the following would be considered a prime contractor? - -A
contractor with whom the project owner has established a contract.

Written for

Institution
Study
Course

Document information

Uploaded on
August 25, 2024
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bravoscores American InterContinental University
Follow You need to be logged in order to follow users or courses
Sold
130
Member since
3 year
Number of followers
50
Documents
9553
Last sold
1 week ago

4.0

32 reviews

5
17
4
6
3
4
2
2
1
3

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions