COSC 475 Select all correct answers. What are the the essential skills for critical thinking - logical analysis - creative thinking - decision making - control calculation - Answer- - logical analysis - creative thinking - decision making what are the 4 level of scheduling - Answer- 1. proposal 2. pre-construction 3. construction 4. look ahead what level fits best with this image - level 1 - Answer- - summarize overall project - start & finish dates for major phases & key milestones what level fits best with this image: level 2 - Answer- - preconstruction - starts to focus on the primary activities and task by trade, looks at critical components what level fits best with this image : level 3 - Answer- - critical path in this course, a critical path method is utilized, and will have a start and finish dates and links for all activities. also called - Answer- level 3 in this course for level 3 construction the duration is set to - Answer- not be longer than 10 days Activities are represented daily and often called a three or four week "___" ecasue it has weekly input from all trades - Answer- look-ahead T/F: tasks can be in any phase of the project or any schedule level - Answer- True Generally tasks can be in any phase of the project, to define a tasks two factors are required - Answer- task-dependent, resource-dependent a zero duration on the project that are important to watch - Answer- milestones a task with fixed dates and duration, should not have predecessors or successors - Answer- deadlines/constraints what are the five keys to successful teams? - Answer- - established roles and responsibilities - defined goals and objectives

Mostrar más Leer menos
Institución
COSC 475
Grado
COSC 475

Vista previa del contenido

COSC 475
Select all correct answers. What are the the essential skills for critical thinking

- logical analysis
- creative thinking
- decision making
- control calculation - Answer- - logical analysis
- creative thinking
- decision making

what are the 4 level of scheduling - Answer- 1. proposal
2. pre-construction
3. construction
4. look ahead

what level fits best with this image
- level 1 - Answer- - summarize overall project
- start & finish dates for major phases & key milestones

what level fits best with this image: level 2 - Answer- - preconstruction
- starts to focus on the primary activities and task by trade, looks at critical
components

what level fits best with this image : level 3 - Answer- - critical path

in this course, a critical path method is utilized, and will have a start and finish dates
and links for all activities. also called - Answer- level 3

in this course for level 3 construction the duration is set to - Answer- not be longer
than 10 days

Activities are represented daily and often called a three or four week "___" ecasue it
has weekly input from all trades - Answer- look-ahead

T/F: tasks can be in any phase of the project or any schedule level - Answer- True

Generally tasks can be in any phase of the project, to define a tasks two factors are
required - Answer- task-dependent, resource-dependent

a zero duration on the project that are important to watch - Answer- milestones

a task with fixed dates and duration, should not have predecessors or successors -
Answer- deadlines/constraints

what are the five keys to successful teams? - Answer- - established roles and
responsibilities
- defined goals and objectives

, - know the system in which you are working
- identify problems and barriers
- know your people

how can quantity of work be examined - Answer- SF, LF, EA, CY

define the term
- the average efficiency of a standard crew in a task - Answer- production rate

weather, congested space, area layout, material handling, crew expertise, safety
requirements, complexity are all factors for ___ - Answer- productivity

work hours = - Answer- quantity of work/production rate

adjusted work hours = - Answer- work hours x productivity factor

activity duration = - Answer- adjusted work hours / hours per workday

gantt charts - Answer- bars show the relationship between tasks

T/F: Testing assumption is key in the logical analysis phase of critical thinking -
Answer- TRUE

in project management describe activitiesthat depend upon one another to proceed.
These dependencies amongactivities will determine the order in which the project
plan proceeds.Predecessors in project management are activities that must begin
orend before a successor task can proceed. - Answer- predecessors and successors

which scheduling relationship types do we use in this class? - Answer- Finish to
Start,
Start to Start, Finish to Finish

which scheduling link extends duration without any critical paths? - Answer- float

which scheduling link has two activities that have delay but it not careful could
become critical - Answer- lags

which scheduling link used level 3 scheduling where you put a specific date for that
activity to start of finish, if not it is considered a delay - Answer- constraints

SS, FF, FS are also called - Answer- logic relationship

the amount of time required to complete a task in work days - Answer- duration

activities with no float connected to determine the amount of time to complete the
project - Answer- critical path

float is called - Answer- free float, total float

which software calls the schedule level tasks - Answer- MP

Escuela, estudio y materia

Institución
COSC 475
Grado
COSC 475

Información del documento

Subido en
25 de agosto de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • cosc 475
  • logical analysis

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Freshy Oxford University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
59
Miembro desde
1 año
Número de seguidores
4
Documentos
6904
Última venta
6 días hace

3.6

10 reseñas

5
3
4
4
3
1
2
0
1
2

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes