An architect working on a project delivered through the design
build method conducts a site visit. The architect observes
unsafe working conditions, noting that several construction
workers are without hard hats.
How...
An architect working on a project delivered through the design-
build method conducts a site visit. The architect observes
unsafe working conditions, noting that several construction
workers are without hard hats.
How should the architect respond?
A. Immediately instruct the construction workers on the safety
precautions that need to be taken. B. Document the unsafe
working conditions in a memo to the contractor that is also
copied to the owner. C. Document the unsafe working
conditions in a memo to the owner that is also copied to the
contractor. D. Ask the contractor to review the safety
precautions that need to be taken with the construction
workers. - CORRECT ANSWER-C. Document the unsafe
working conditions in a memo to the owner that is also copied
to the contractor.
An architect is working on a large project with a construction
manager (CM) as-contractor. All designers and engineers have
been retained and the design is approximately 50% complete.
Due to the size of the project, the CM is unable to secure a
bond for the entire contracted project. Smaller construction
contracts will be necessary. The owner and architect want all
design and construction team members to continue in their
current roles.
, Which delivery method should the architect recommend to the
owner?
A.Design-buildB.CM as-advisor C. Multiple prime D. Design-
bid-build - CORRECT ANSWER-B. CM as-advisor
An owner wants to build a warehouse and has hired the
architect to develop a building program and document the
owner's requirements. The programming documents have just
been completed.
Which delivery method should the architect suggest to minimize
the need for owner involvement in finishing the project?
A. Design-bid-build B. Design-build C. CM at-risk D. Integrated
project delivery - CORRECT ANSWER-B. Design-build
A university hires an architect to design a renovation and
addition to a performing arts center. The university wants to use
an integrated project delivery method and contract with a series
of consultants who will each coordinate their scope of work with
the architect. The work is to be executed in multiple phases and
includes the following:
Restore the original facade of the existing facility built in 1905.
Convert the existing sloped concrete floor performance hall into
a new flat floor performance space.
Renovate existing classrooms to provide new advanced audio
and video laboratories.
Design a performance hall addition connected to the existing
facility by an elevated walkway.
Identify and address any AHJ or accessibility issues in the
existing facility.
Who should the architect recommend the university hire before
the schematic design phase? Check the four that apply. -
CORRECT ANSWER-A. General contractor
C. Geotechnical engineer
E. Historical preservationist
F. Construction manager
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller supergrades1. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.99. You're not tied to anything after your purchase.