100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NASCLA BOOKS COMBINED (QUESTIONS AND ANSWERS) WITH COMPLETE SOLUTIONS!! $7.99   Add to cart

Exam (elaborations)

NASCLA BOOKS COMBINED (QUESTIONS AND ANSWERS) WITH COMPLETE SOLUTIONS!!

 1 view  0 purchase
  • Course
  • ...
  • Institution
  • ...

NASCLA BOOKS COMBINED (QUESTIONS AND ANSWERS) WITH COMPLETE SOLUTIONS!!

Preview 4 out of 216  pages

  • August 26, 2024
  • 216
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ...
  • ...
avatar-seller
stuuviaa
Name: Score:


629 Multiple choice questions

Term 1 of 629
What do use hang gutters and what is the slope on them

4" minimum and 7" max in height and 11" in depth.

Average new construction projects generate about 4 pounds of waste per foot of building
area.


You use wraparound hangers to hang gutters in place and they must slope 1" for every 16
feet.

High Water table means that extra cost will be encountered during the excavation and
construction of foundation

Term 2 of 629
WHO is responsible for safety on a job site

Table 716.6 - Fire window assembly fire protection ratings

wind damage
employee injury
construction material lost


The Prime Contractor


PIN connections are designed to resist vertical loads ONLY. They consist of angles or plates
bolted or welded to the girder web. MOMENT resistant connections are used in building
frames that are designed as rigid frames that depend on the stiffness of the column
sections to provide lateral stability.

,Term 3 of 629
What does the rate of pour affect

Lateral pressure of concrete on the form work

Curing time of the concrete


Color of the concrete mix


Temperature of the surrounding environment

Definition 4 of 629
There are 4 types of decks - Composite Floor, Roof, Cellular and Form Decks.

What are the different types of Portland Cement


4 - What are the different types of Decks and width

15-5 What are the penalties for non-filing of federal deposits

4-8 Which are the parties to a bond agreement

Definition 5 of 629
Completion of a project is complex, a poorly planned, under staffed closeout is bad for
reputation. Punch list items can annoy the owner, subs have left the job so it is difficult to
schedule the work.

reasons for starting a project early


importance of project budget planning

185 - Why is closing a project hard

challenges of project initiation phase

,Term 6 of 629
11- TRUSS PLUM TABLE

You use Form 940 for FUTA

11- TRUSS PLUM TABLE

file an SS4 form


Shop drawing flowchart 4-3

Term 7 of 629
210 - How much should the sandblasting pressure be to clean brick

Sandblasting pressure must be between 60 and 100 psi

a 45 degree slope convert to a slope percentage of a 100% slope.


Skill saws must have a point of operation guard.

preservative treated wood have on them a quality mark of an inspection agency.

Definition 8 of 629
WHEELED BACKHOE

What must occur before adding load to a truss


Best equipment to dig around existing utility lines

4 - what are the different types of decks and width

Which is the best place to keep shop drawings

, Term 9 of 629
When is a geotechnical inspection required for backfilling a footing.

backfilling more than 22"under a footing.

backfilling more than 6"under a footing.

backfilling more than 2"under a footing.


backfilling more than 12"under a footing.

Term 10 of 629
Resilient channel placement

When you clear more than 10 acres a retention pond is required.

58- drainage and sidewalk


2" from FLOOR
6" from CEILING

Lateral pressure of concrete on the form work

Definition 11 of 629
Figure 13-32 Gutter hangers

818 - Figure 13-32 Gutter hangers

409 - Figure 13-32 Gutter hangers

408 - Figure 13-32 Gutter hangers

409 - Figure 8-11 Gutter hangers

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller stuuviaa. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart