100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COSC 153 EXAM 1 with Complete Solutions $10.99   Add to cart

Exam (elaborations)

COSC 153 EXAM 1 with Complete Solutions

 5 views  0 purchase
  • Course
  • COSC 153
  • Institution
  • COSC 153

COSC 153 EXAM 1 with Complete Solutions

Preview 2 out of 6  pages

  • August 28, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • COSC 153
  • COSC 153
avatar-seller
LUCKYSTAR2022
COSC 153 EXAM 1 with Complete Solutions
1) how the contractors price is quoted to the owner
2)how risk is allocated to each of the parties - ANSWER-2 fundamental ways in which
contracts differ?

1/4" scale - ANSWER-what is the most common scale for an architect to draw their
plans

able to mentally build project, be knowledgeable, and practical - ANSWER-qualities of a
good estimator?

add on - ANSWER-taxed overhead, and profit added to the estimate after all the other
costs have been calculated is called what?

advertisement for bids - ANSWER-public notice providing info regarding bidding
procedures for public projects

advertisement or invitation for bids, instructions to bidders, bid forms, and the
agreement form - ANSWER-4 documents included under the bidding processes

all materials, equipment, labor, subcontracts, overhead, profit necessary - ANSWER-
what are some categories which a contractor must include when submitting a bidding
estimate?

an agreement that is spoken - ANSWER-what is a verbal contract?

approximately 56% - ANSWER-what percentage of design/build projects are led by
contractors?

Architects & engineers - ANSWER-what 2 types of professionals are engaged in the
construction process?

at risk = 2 contracts (owner & manager, owner & designer) - ANSWER-difference
between at-risk and agency construction management?

bidding documents, general conditions, supplemental conditions, and technical
specifications - ANSWER-4 sections of the process manual?

bridges, tunnels, dams, airports, & railways - ANSWER-Heavy civil sector includes what
types of civil construction?

Brooks Act 1972 - ANSWER-what piece of legislation requires that qualifications based
selections must be used to purchase architecture and engineering services and that
price negotiations are not a consideration in the selection processes?

, Brownfield site - ANSWER-a property that is abandoned or underused because of
historic environmental contamination?

by the standards set forth in the specs that impact costs - ANSWER-good quality of
your work?

civil, architectural, structural, mechanical, electrical - ANSWER-different organizations
of drawings?

closed bid - ANSWER-used with private projects and is not open to the public

conceptual estimates, preliminary estimates, and detailed estimates - ANSWER-types
of estimates ?

construction involvement early in the design process generally allows for a shorter and
cheaper project - ANSWER-why is there an increasing trend towards Integrated Project
delivery methods?

Construction Specification Institute - ANSWER-what does CSI stand for?

cost, time, quality, safety, scope, & function - ANSWER-6 dials of project values?

curtain wall - ANSWER-whats an exterior cladding system thats supported entirely by
the frame of the building, rather than being self-supporting or load bearing?

custom, small value, & production builders - ANSWER-3 categories of residential
builders?

customer satisfaction and contractor profit - ANSWER-2 things that measure the
success of a project ?

decision making and problem solving - ANSWER-2 important skills needed to succeed
in construction management?

design phase - ANSWER-first step of a project?

design, pre-construction, procurement, construction, post construction, owner
occupancy - ANSWER-6 stages of the design and construction process?

design/bid/build, construction management, & design/build - ANSWER-3 project
delivery methods?

determine who is preparing to build new projects and when they will be ready to start -
ANSWER-what is the first step in the process of finding work?

direct costs and indirect costs - ANSWER-2 types of project costs?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LUCKYSTAR2022. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62555 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart