What is the BEST way to determine how reverberant a space is? - Answer -Use an RT60 meter
The correct time to discuss visible finishes for wall plates, surface mount speakers, and wall mounted
screen casings is during the: - Answer -Site Survey
Speak with the client about getting more information on how to address the noise source. - Answer -
While surveying a conference room for a system upgrade, an engineer measures 55 dB SPL A-wtd of
ambient noise when the room is empty. How should they proceed? -Add voice lift to the system
proposal
Divisible Room - Answer -A client needs to add videoconferencing functionality for high-level, private
meetings. Which of following planned space types should you advise be ruled out?
The Design Phase - Answer -Which phase of an AV project comes immediately AFTER the Program
Phase?
Detailed list of equipment - Answer -Which is NOT presented in the program report:
An overview of the programming process including who was surveyed during the process. - Answer -
When preparing an executive summary what should be included for submittal to the client?
, Additive color system - Answer -Which system is used to show colors from a video display?
An installed audio system should be AT LEAST __________ above the ambient noise floor. - Answer --
25dB
A device is controlled using the pictured cable. What is the MOST LIKELY method of controlling this
device? - Answer -RS-232
The minimum load safety rating for mounting audio visual equipment is: - Answer -5:1
As part of regular system maintenance, when is the BEST time to update device firmware? - Answer -On
Friday afternoons.
The brightness controls on a display adjusts which level? - Answer -Black Level
When verifying a display system, which of the following should be used to determine if it meets a
specified contrast ratio? - Answer -Spot Photometer
When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. In what phase does this occur? - Answer -Design
Phase
An owner representative contests an invoice that was mailed after an emergency service call which had
determined the problem was "operator error". Which of the following is *least* likely to prevent this
type of misunderstanding? - Answer -Predetermine the there is no need for service agreement given
predicted mean time between failure for a TV
A client indicates that they are experiencing video dropouts in a room. Which of the following is the
BEST item for a technician to use when evaluating the system? - Answer -Test pattern generator/ HDCP
generator
A junior level technician observes a senior level technician occasionally taking a pen like device out of
her shirt pocket and laying it along other cables in the area of where they are working. What might the
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Zanaya. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $13.99. You're not tied to anything after your purchase.