What are the four teams that comprise the overall Project Team? - Answer -Owner, Design, Installation,
and Management
Who would belong to the Design team? - Answer -Anyone with Consultant in their title except the
moving consultant
Which groups make up the Management Team? - Answer -Developer, Construction Manager, and
Building Management Agency
The End-User, Facility Manager and Building Committee comprise which team within the Project Team?
- Answer -Owner
Which group represent the generic roles that are important to the Project process? - Answer -Project
Managers, Designers and Installers
Which project characteristics must be considered in order to determine which method is best suited for
a particular project? - Answer -Schedule, Size, Type, Complexity, and Procurement Requirements
What is an important aspect of funding that has a direct impact on the project process and
design/installation? - Answer -Technical Support Funding
,Whether a construction project is large or small, which milestones must be achieved in a typical
schedule? - Answer -Programming, Building Design, AV Bid, and Move-In
What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - Answer -
Long term projects with extended project cycles
What is the risk in using an OFE/Integrator Installed contract structure? - Answer -System and
infrastructure design and facility functionality may suffer
What are some of the important project scope and size considerations in selecting an AV provider? -
Answer -Financial Stability, Current Workload, and Company Credentials
What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel,
and Warranty Response Time? - Answer -RFQ
a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? - Answer -Negotiate with the highest ranking
firm to finalize the contract
What is one of the disadvantages of contracting the AV integrator to the electrical
subcontractor? - Answer -More layers of responsibility and communication
When conducting a complete project bid process, what milestone follows the issuing of the RFP? -
Answer -Pre-Bid Meeting
Under what circumstances would you likely use an A305-1986 form? - Answer -Scoring responses to an
RFQ
What is the ideal way to contract an AV integrator? - Answer -Directly to the Owner
The process of identifying the activities that end-users need to perform, and developing the functional
descriptions of your systems is referred to as:? - Answer -Needs Analysis
, What is the main task of the third Step of the Program Phase of a Project? - Answer -Conducting
program meetings
What should be included in the written Program Report? - Answer -...A conceptual and functional
system description
The more accurate means to estimate dimensions of a commercial space during a site inspection would
be to? - Answer -Count Ceiling Tiles in a drop tile instalation
A client requires a new boardroom. The sales person and engineer are sent to the premises to measure
the facility and talk to the client. At this stage they should be performing a _ - Answer -Needs Analysis
Sightlines for audience viewing in a given presentation space can be improved by: - Answer -Providing a
sloped, or stepped, seating arrangement
After presenting a proposal, what is the correct plan of action for following up with the client? - Answer -
Regularly, until a decision is made
AV professionals determine the end user's needs by examining three things: the required applications,
the tasks, and the: - Answer -Functions to support the applications
When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. What phase is the project in? - Answer -Design
phase
The HDTV aspect ratio is equal to which of the following? - Answer -1.78:1
Please select the appropriate resolution for SXGA. - Answer -1280 x 1024
The Brightness control adjusts which level? - Answer -Black Level
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Zanaya. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.99. You're not tied to anything after your purchase.