100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCIDQ - PRAC REVIEW QUESTIONS AND ANSWERS WITH SOLUTIONS 2024 $13.99   Add to cart

Exam (elaborations)

NCIDQ - PRAC REVIEW QUESTIONS AND ANSWERS WITH SOLUTIONS 2024

 7 views  0 purchase
  • Course
  • NCIDQ
  • Institution
  • NCIDQ

NCIDQ - PRAC REVIEW QUESTIONS AND ANSWERS WITH SOLUTIONS 2024

Preview 2 out of 6  pages

  • August 30, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCIDQ
  • NCIDQ
avatar-seller
Performance
NCIDQ - PRAC REVIEW QUESTIONS
AND ANSWERS WITH SOLUTIONS 2024
Smoke detectors required in which areas? - ANSWER All rooms, corridors and storage areas.



What is the required barrier-free knee clearance space? - ANSWER 30"W x 27"H x 17"D (34"H
countertop)



List the differences between 'Custome facing spaces', Employee Work space', & 'Shared space' - ANSWER
Customer facing spaces: designed specifically for for interacting with guests.

Employee work space: would include individual offices as well as shared work stations.

Shared space: include areas used/and shared by more than one employee at a time. (restrooms are not
shared space unless more than one stall.)



What are accessible grab bar mounting heights and lengths around barrier-free toilets? - ANSWER 33-36"
AFF, 42"L to side and 36"L at rear



What is net area? - ANSWER The space required for the function in a space. Does not include other
usable areas, wall thicknesses, etc. 'net assignable area'. Actual space required by a client not including
circulation.



What is the gross area? - ANSWER defined as 'construction area' by BOMA. The floor area measured
from outside face of exterior wall, inside face of corridor wall, centreline of demising wall.



What is included in the rentable area? - ANSWER Includes net area, circulation and shared spaces
including restrooms, corridors, elevator lobby, mechanical spaces, and other amenity spaces used by the
tenant. *Not including exits

Calculated gross area x building load factor



Occupant load is measured __________ of the multi-tenant corridor partition.

- __________ of the demising partition

- __________ of the exterior partition. - ANSWER Inside face, centreline, inside face of glass.

, When an office lease space only occupies a portion of a floor, the occupant area is measured to the
inside face of the tenant side of the multi-occupant corridor partition.



What is required to to demonstrate an accessible path of travel? - ANSWER Turning circle at
exit/entrance and changes in direction, corridor width, push/pull clearances at entrance/exit



List the plans required by code. - ANSWER 1. Egree

2. Emergency signage

3. Fire detection and alarm system

4. Sprinkler systems

5. Accessibility

6. Plumbing fixture counts



Where are fire rated partitions required? - ANSWER F = first access (public corridors - how did you get to
the space)

I = into and around the space (tenant / demising walls)

R = really big meeting rooms (assembly spaces / 750 SQFT and up)

E = everyone forgets about large storage! (storage rooms larger than 100 SQFT)



What is standard door type for commercial spaces? - ANSWER Solid core wood door with hollow metal
frame.



What is the clear opening of a 36" door? - ANSWER 32"



The circulation of a building is included in what square foot calculation total? - ANSWER Occupant area
includes the Net area (programmed area), circulation,



A vertical change in floor finish cannot exceed what height without a sloped transition piece? - ANSWER
Less than 1/4"

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Performance. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart