MSSC MAINTENANCE AWARENESS
EXAM Questions and Answers Latest
UPDATES 2024 GRADE A+
Circuit testers assess if electricity is present - answer AC.
In a PM audit, a large number of uncompleted PM work orders would most likely
have a negative influence on the results. - ANSWER Critical Path
What is the purpose of Total Productive Maintenance (TPM)? - ANSWER: Zero
failures and faults.
A chain should be changed when it reaches a length that is longer than the
original. - ANSWER 3 percent
Before shutting down a machine for preventive maintenance, the maintenance
specialist must remove all of the trash and sediment from the machine.
Where would a worker obtain information regarding the use of all lubricants and
safety precautions—ANSWER SDS file
When lubricating a bearing, the worst mistake is to get dirt in the bearing.
The most evident evidence that V-belt pulleys are worn beyond usefulness is when
the ANSWER belt touches the bottom of the groove.
Which of the following is an essential planned maintenance activity? ANSWER:
Lubricate equipment.
Preventive maintenance programs would often include ANSWER frequency.
It is vital to have a/an for the closure of PM work orders. ANSWER
completion date
, Frequently, the employee finishing out the PM work order ensures that - ANSWER
preventive maintenance was accomplished.
Which of the following bolts has a value of 5? - Answer the screw with three lines.
Scheduled repair of minor parts that wear quickly is a crucial aspect of
maintenance. - The answer is preventive.
Which of the following would be considered an unscheduled downtime
maintenance activity? - ANSWER Reactive Maintenance
All documentation for preventative maintenance should be retained in a specified,
safe, and secure area.
Making sure that a motor shaft is level - ANSWER lowers the amount of required
shims
When testing for out-of-round, any movement of the dial indicates that the -
ANSWER shaft could be out-of-round.
Follow-up work created after considering PM - ANSWER predictive
Daily maintenance requires keeping daily records since repeating events can be
studied to troubleshoot problems.
A machine is expected to have downtime throughout multiple shifts. What is the
proper way to communicate between shifts for lockout/tagout procedures? -
ANSWER Send a company-wide email; maintenance personnel should check for
energy and change locks.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller KGeorge. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.