NCCER Electrical 1 Module 11 Exam Questions with Latest Update
6 views 0 purchase
Course
NCCER Electrical
Institution
NCCER Electrical
Appliances - Answer-Equipment designed for a particular purpose
Branch Circuit - Answer-That portion of a wiring system extending beyond the final overcurrent device protecting the current
Feeder - Answer-All circuit conductors between the service equipment, the source of a separately derived...
NCCER Electrical 1 Module 11 Exam
Questions with Latest Update
Appliances - Answer-Equipment designed for a particular purpose
Branch Circuit - Answer-That portion of a wiring system extending beyond the final
overcurrent device protecting the current
Feeder - Answer-All circuit conductors between the service equipment, the source of a
separately derived system, or other power supply source and the final branch-circuit
overcurrent device.
Load Center - Answer-A type of panel board that is normally located at the service
entrance of a residential installation. (It usually contains the main disconnect)
service entrance - Answer-The point of delivery of electricity to a building by a public
utility company
Service entrance conductors - Answer-The conductors from the service point to the
service disconnecting means.
Switch - Answer-A device for making, breaking, or changing the connections in an
electrical circuit.
Bonding bushing - Answer-A special conduit bushing equipped with a conductor
terminal to accept a bonding jumper
Bonding jumper - Answer-A bare or green insulated conductor used to ensure the
required electrical conductivity between metal parts required to be electrically
connected.
Service Drop - Answer-The overhead conductors between the utility electric supply
system and the service point.
Service entrance equipment - Answer-Equipment that provides overcurrent protection to
the feeder and service conductors
Service Lateral - Answer-The underground conductors through which service is
supplied between the power companys distribution facilities and the first point of their
connection to the building
Roughing In - Answer-The first stage of an electrical installation when the raceway
cable wires boxes and other equipment are installed
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller lectknancy. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.49. You're not tied to anything after your purchase.