100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NEBOSH NCC1 PRACTICE REVIEWS WITH ANSWERS $13.49   Add to cart

Exam (elaborations)

NEBOSH NCC1 PRACTICE REVIEWS WITH ANSWERS

 1 view  0 purchase
  • Course
  • NEBOSH
  • Institution
  • NEBOSH

NEBOSH NCC1 PRACTICE REVIEWS WITH ANSWERS

Preview 3 out of 25  pages

  • September 5, 2024
  • 25
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • nebosh
  • NEBOSH
  • NEBOSH
avatar-seller
Solutionsgrade1
NEBOSH NCC1 PRACTICE REVIEWS
WITH ANSWERS


Construction issues - CORRECT ANSWER-Transitory nature
of workers
Temporary nature of construction activities and the constantly
changing workplace
Time pressures from clients and principal contractors
Weather conditions
Levels of numeracy and literacy of workers
Non-English speaking workers

High risk areas for injuries in construction - CORRECT
ANSWER-Falls from height
Slips, trips and falls
Being struck by falling/moving objects
Manual handling

Construction (Design and Management) Regulations 2007 -
CORRECT ANSWER-Apply to all construction projects
Duties placed on clients, designers and all construction workers

CDM regs - notifiable projects - CORRECT ANSWER-
Construction phase will last longer than 30 days
Construction phase will involve more than 500 person days at
work

Duty holders for notifiable projects - CORRECT ANSWER-
Client - have most influence
Designers - have responsibility beyond construction phase
Contractors - competence
CDM Co-ordinator - advise client of their duties, co- ordinates
others

,Principal contractor - safe working, co- ordination and co-
operation between contractors

CDM client duties - CORRECT ANSWER-Appoint competent
persons
Ensure suitable mgmt of welfare
Allow sufficient time and resources
Provide pre-construction info
Appoint duty holders for notifiable projects
Retain and provide access to health and safety file

CDM co-ordinator CDM duties - CORRECT ANSWER-Advise
and assist client with their duties
Notify HSE
Co-ordinate H&S aspects of design work and co-operate with
others
Facilitate good communication
Liaise with principal contractor re ongoing design
Pass on pre-construction information
Prepare/update H&S file

Designer CDM duties - CORRECT ANSWER-Check client is
aware of their duties
Eliminate hazards and reduce risks during design
Provide information about remaining risks
Check CDM co-ordinator has been appointed
Provide any information needed for H&S file

Principal contractors CDM duties - CORRECT ANSWER-Plan,
manage and monitor construction phase
Prepare, develop and implement a written plan and site rules
Give contractors relevant parts of the plan
Provide suitable welfare facilities
Check competence of all appointees
Site inductions and further info and training
Consult with workers
Liaise with CDM-c

, Secure the site

Contractor CDM duties - CORRECT ANSWER-Check client
aware of duties
Plan, manage and monitor own work and that of workers
Check competence
Train own employees
Comply with part 4 of CDM regs
Ensure adequate welfare facilities
Co-operate with principal contractor

Pre-construction information - CORRECT ANSWER-
Description of the project
Management requirements and provisions
Environmental restrictions and existing risks on site
Design and construction hazards
Health and safety file

Construction phase H&S plan - CORRECT ANSWER-Relevant
info from pre-construction information
Project description and programme or works with key dates
Identify the organisation in place (mgmt structure,
responsibilities and "who does what")
Identify arrangements in place to manage H&S risks
Show how construction work will be co-ordinated and how
consultation will be achieved
Contain the H&S file

Health and safety file contains: - CORRECT ANSWER-Brief
description of the work carried out
As built dwgs
Survey info (e.g. Asbestos) and groundwork plans
Location of services
Key structural issues and safe loading of floors, roofs etc.
Safety info regarding any hazardous substances or materials
used
Information re maintenance issues

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Solutionsgrade1. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76669 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart