A |fire |department |access |road |is |permitted |to |be |what |maximum |distance |from |any |portion |of
|the |exterior |wall |of |a |building |- |correct |answer-150 |Ft
What |is |the |class |of |an |interior |wall |and |ceiling |finish |that |has |a |flame |spread |index |of |38 |and |
a |smoke |developed |index |of |150 |- |correct |answer-Class |b
What |is |the |minimum |frequency |that |employees |of |airport |traffic |control |towers |be |instructed
|on |an |emergency |action |plan |- |correct |answer-Annual
How |often |do |pipes |and |fittings |for |a |dry |system |need |to |be |inspected |- |correct |answer-Annual
A |vocational |tech |school |has |a |woodworking |shop |used |for |educational |purposes. |What |is |the
|occupant |load |factor |for |this |type |of |use |- |correct |answer-50 |net |ft
What |minimum |total |combined |hose |stream |allowance |is |required |for |a |hydraulically |
calculated |sprinkler |system |protecting |an |extra |hazard |area |- |correct |answer-500 |gpm
Foam |agents |are |most |common |to |what |class |of |fires? |- |correct |answer-Class |A |and |B
When |operated |at |maximum |speed |fully |open |indicating |valves |must |remain |open |for |what |
minimum |amount |of |time |before |closing |- |correct |answer-5 |seconds
How |much |advance |notice |is |required |when |inspector |is |investigating |a |complaint |
concerning |serious |fire |and |life |safety |violations |- |correct |answer-No |advance |notice |is |
required
, What |is |the |maximum |occupant |load |allowed |for |an |existing |sprinkler |two |story |assembly |
occupancy |of |type |ll |[000] |construction |- |correct |answer-300
When |dots |an |inspector |have |the |authority |to |order |occupants |to |vacate |a |building |- |correct |
answer-If |an |immediate |danger |exist
Which |of |the |following |is |a |verbal |affirmation |or |declaration |made |under |oath |in |a |court |of |
law |- |correct |answer-Testimony
Which |stage |of |a |fire |within |a |compartment |does |the |fuel |source |produce |some |heat |but |has |
not |yet |spread |to |other |substances |nearby |- |correct |answer-Incipient
An |automatic |sprinkler |system |is |required |in |an |airport |terminals |concourse |when |it |exceeds |
what |total |floor |area |- |correct |answer-12,000 |ft
Which |of |the |following |is |describe |as |the |propagation |of |a |flame |over |a |surface |- |correct |
answer-Flame |spread
Which |flammable |and |combustible |liquids |must |be |stored |in |a |closed |tanks |or |containers |
when |not |in |use |and |ambient |or |process |temperatures |are |at |or |above |their |flash |points |- |
correct |answer-Class |II |and |III
Manual |fire |alarm |box |shall |be |located |within |how |many |inches |of |exit |doorways |- |correct |
answer-60 |inches
How |often |do |monitor |nozzles |used |with |private |service |mains |need |to |be |inspector |- |correct |
answer-Semiannual
What |is |the |maximum |amount |of |lumber |permitted |to |be |stored |in |a |lumber |yard |before |a |
permit |is |required |- |correct |answer-100,000 |board |ft
A |fire |department |access |road |is |permitted |to |be |what |maximum |distance |from |any |portion |of
|the |exterior |wall |of |a |building |- |correct |answer-150 |Ft
What |is |the |class |of |an |interior |wall |and |ceiling |finish |that |has |a |flame |spread |index |of |38 |and |
a |smoke |developed |index |of |150 |- |correct |answer-Class |b
What |is |the |minimum |frequency |that |employees |of |airport |traffic |control |towers |be |instructed
|on |an |emergency |action |plan |- |correct |answer-Annual
How |often |do |pipes |and |fittings |for |a |dry |system |need |to |be |inspected |- |correct |answer-Annual
A |vocational |tech |school |has |a |woodworking |shop |used |for |educational |purposes. |What |is |the
|occupant |load |factor |for |this |type |of |use |- |correct |answer-50 |net |ft
What |minimum |total |combined |hose |stream |allowance |is |required |for |a |hydraulically |
calculated |sprinkler |system |protecting |an |extra |hazard |area |- |correct |answer-500 |gpm
Foam |agents |are |most |common |to |what |class |of |fires? |- |correct |answer-Class |A |and |B
When |operated |at |maximum |speed |fully |open |indicating |valves |must |remain |open |for |what |
minimum |amount |of |time |before |closing |- |correct |answer-5 |seconds
How |much |advance |notice |is |required |when |inspector |is |investigating |a |complaint |
concerning |serious |fire |and |life |safety |violations |- |correct |answer-No |advance |notice |is |
required
, What |is |the |maximum |occupant |load |allowed |for |an |existing |sprinkler |two |story |assembly |
occupancy |of |type |ll |[000] |construction |- |correct |answer-300
When |dots |an |inspector |have |the |authority |to |order |occupants |to |vacate |a |building |- |correct |
answer-If |an |immediate |danger |exist
Which |of |the |following |is |a |verbal |affirmation |or |declaration |made |under |oath |in |a |court |of |
law |- |correct |answer-Testimony
Which |stage |of |a |fire |within |a |compartment |does |the |fuel |source |produce |some |heat |but |has |
not |yet |spread |to |other |substances |nearby |- |correct |answer-Incipient
An |automatic |sprinkler |system |is |required |in |an |airport |terminals |concourse |when |it |exceeds |
what |total |floor |area |- |correct |answer-12,000 |ft
Which |of |the |following |is |describe |as |the |propagation |of |a |flame |over |a |surface |- |correct |
answer-Flame |spread
Which |flammable |and |combustible |liquids |must |be |stored |in |a |closed |tanks |or |containers |
when |not |in |use |and |ambient |or |process |temperatures |are |at |or |above |their |flash |points |- |
correct |answer-Class |II |and |III
Manual |fire |alarm |box |shall |be |located |within |how |many |inches |of |exit |doorways |- |correct |
answer-60 |inches
How |often |do |monitor |nozzles |used |with |private |service |mains |need |to |be |inspector |- |correct |
answer-Semiannual
What |is |the |maximum |amount |of |lumber |permitted |to |be |stored |in |a |lumber |yard |before |a |
permit |is |required |- |correct |answer-100,000 |board |ft