100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ICC General Requirements Part 2 Questions and Answers 2024 $14.49   Add to cart

Exam (elaborations)

ICC General Requirements Part 2 Questions and Answers 2024

 5 views  0 purchase
  • Institution
  • ICC

ICC General Requirements Part 2

Preview 1 out of 2  pages

  • September 7, 2024
  • 2
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (277)
avatar-seller
julianah420
ICC General Requirements Part 2

A typical commercial building would likely fall under which risk category? – answer II

Who approves the special inspection agency? - answer The building official

What is one of the duties of a special inspector prior to arriving at the job site? - answer
Discuss reporting frequency with the building official

Who notifies the special inspector of upcoming inspection task? - answer The contractor

What is something you would find in a statement of responsibility? - answer Method and
frequency of reporting as well as distribution of the reports

Special inspections are performed by a special inspector and not a jurisdictional
inspector because: - answer Special inspections are for critical building elements and
required special knowledge of the component

Structural observations are: - answer Performed by the registered design professional

The Special Inspection Manual is primarily derived from: - answer The IBC

If a structure is assigned a risk category I, then: - answer The building is likely
infrequently occupied

The special inspection agreement is signed by: - answer Building official, contractor,
registered design professional, special inspection agency

Who has the authority to stop work? - answer Building official

What does the special inspector not need to include in an inspection report? - answer
His or her opinion of the contractor's performance

If the special inspector observed an apparent non-conformance, but the contractor says
it has been approved by the engineer, what should the special inspector do? - answer
Request to see documentation of the approval

Which one of the following duties does not apply to the registered design professional? -
answer Approve the statement of special inspections

Who must acknowledge awareness of special construction and inspection requirement
of an SFRS system? - answer Contractor

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.49
  • (0)
  Add to cart