100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI WRITTEN EXAM QUESTIONS AND ANSWERS $12.49   Add to cart

Exam (elaborations)

ACI WRITTEN EXAM QUESTIONS AND ANSWERS

 1 view  0 purchase
  • Course
  • ACI
  • Institution
  • ACI

ACI WRITTEN EXAM QUESTIONS AND ANSWERS

Preview 2 out of 9  pages

  • September 11, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ACI
  • ACI
avatar-seller
GEEKA
ACI WRITTEN EXAM QUESTIONS AND ANSWERS

The sensor of the temperature measureing device shall be submerged a minimum of
____ in - Answers -3 (75mm)

The temperature measureing device shall have a capacity of measuring temperature of
freshly mixed conrcrete to +-_____ degrees F throught a range of _____ - Answers -
1(.5 degrees C), 30-120 (0-50 degrees C)

The temperature measuring device shall be calibrated____, or whenever there is a
question of _____ - Answers -annually, accuracy

The temp of concrete may be measured in a wheelbarrow - Answers -true

the temp of concrete may be measured in a wall form - Answers -true

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temp. - Answers -false

What must be done to the sample container prior to sampling the concrete - Answers -
dampen (with water)
the molding of strength test specimens shall begin within ____ minutes after fabricating
the composite sample - Answers -15

The concrete sample must be protected from contamination and ____ - Answers -rapid
evaporation

The minimum size sample test specimen is - Answers -28 L (1ft^3)

when sampling from a stationary mixer the batch must be sampled at _____ or more
regularly spaced intervals during discharge of the middle portion of the batch - Answers
-2

The composite sample for a paving mixer must represent a minimum of _____ different
portions of the batch of concrete taken from the pile after discharge - Answers -5

When sampling from a revolving drum truck mixer, concrete must be sampled at a
minimum of ______ regularly spaced intervals during discharge of the middle portion of
the batch - Answers -2

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the job site - Answers -False

The composite sample from a truck mixer must be obtained from the _____ portion of
the batch - Answers -Middle

, When the concrete contains aggregate larger than permitted for a particular test
method, the sample fo concrete must be ______ ______ before making the test -
Answers -Wet Sieved

The slump test is applicable to plastic concrete with a max aggregate size of ____ in -
Answers -1.5 in (37.5 mm)

When concrete contains aggregate larger than allowed for the slump test the large
aggregate must be - Answers -removed by wet sieving the sample over 1.5 in sieve

The mold for making the slump test is the shape of - Answers -the frustum of a cone

The height fo the slump mold is _____ in - Answers -12

The interior surface of the slump mold is allowed to have minor irregularities - Answers -
false

For use in the slump test, the end or both ends of the tamping rod must be - Answers -
rounded

the sample of concrete for use in making the slump test must be obtained in accordance
with ASTM standard ________ - Answers -C172 (Standard Practice for sampling freshly
mixed concrete

The slump mold should be in a dry condition before the beginning of the test - Answers -
false

the surface on which the slump mold will be placed must be _____ - Answers -flat, level
moist, nonabsorbent, free of vibration

The slump mold is filled in ____ layers - Answers -3

what must be done to the concrete surrounding the temp measuring device after the
device has submerged - Answers -Press concrete around measuring device

How long must the temp device remain in the concrete - Answers -at least 2 minutes
(but no more than 5)

After temp of concrete is read, what then is required - Answers -reporting of temp

the temp of concrete to be measured to the nearest ____degree F - Answers -1 (.5
degree C)

According to the ASTM C1064 what is one reason to take the temp of concrete -
Answers -verify conformance to a specified requirement for temp

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GEEKA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76877 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart