TMS3733 Assignment
5 (COMPLETE
ANSWERS) 2024 - DUE
September 2024 ;
100% TRUSTED
Complete, trusted
solutions and
explanations.
ADMIN
[COMPANY NAME]
,TMS3733 Assignment 5 (COMPLETE ANSWERS) 2024 -
DUE September 2024 ; 100% TRUSTED Complete, trusted
solutions and explanations.
QUESTION 1 The design process step 3 is referred to as the
make stage. It is important to plan for this stage. Planning
includes those activities which are involved when working out,
in advance, how a product, process or system is to be produced
or realised before actually doing it. Make notes regarding the
materials needed by finding answers to the following questions:
a. What different types of material are needed? (2) b. What
should the quality of the different materials be? (2) c. What are
the sizes of the available raw materials? (3) d. Will the different
materials have to be cut to size? (5) e. Will the different
materials have to be shaped? (5) f. What does the final finish of
the product or prototype have to be? (3) [20]
When planning the "make" stage in the design process, it's
essential to thoroughly consider and document various aspects
related to materials. Here are the detailed notes for each of the
questions:
a. What different types of material are needed? (2)
1. Raw Materials: These are the fundamental materials from
which the product will be made, such as metals (e.g.,
aluminum, steel), plastics (e.g., ABS, polycarbonate), wood
(e.g., plywood, MDF), or textiles (e.g., cotton, synthetic
fibers).
2. Components and Parts: These include pre-manufactured
parts that will be assembled into the final product, such as
, screws, bolts, hinges, electronic components (e.g., sensors,
microcontrollers), and fasteners.
b. What should the quality of the different materials be? (2)
1. Raw Materials Quality: The quality of raw materials
should meet the required standards for strength, durability,
and safety. For example, metals should have appropriate
tensile strength and corrosion resistance, while plastics
should have suitable impact resistance and temperature
tolerance.
2. Component Quality: Components and parts should be
manufactured to precise tolerances and specifications to
ensure proper fit, function, and longevity. For instance,
electronic components should be reliable and tested for
performance.
c. What are the sizes of the available raw materials? (3)
1. Sheet Materials: For materials like metal or plastic sheets,
sizes can vary, commonly found in dimensions like 4x8
feet (1.22x2.44 meters) or custom sizes depending on
suppliers.
2. Bars and Rods: Metal or plastic rods might come in
standard diameters and lengths, such as 1-inch diameter
and 6-foot lengths or similar variations based on material
type and supplier.
3. Wood Planks and Panels: Wood materials often come in
sizes such as 2x4 inches for planks or 4x8 feet sheets for
panels, with thicknesses varying from 1/4 inch to several
inches.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Jennifer2024. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $2.50. You're not tied to anything after your purchase.