100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
PSPO I, PSM I E PSPO I EXAM STUDY PACK 2024| 1200+ EXAM QUESTIONS WITH 100% CORRECT CHOICE GRADED A+ $18.49
In winkelwagen

Tentamen (uitwerkingen)

PSPO I, PSM I E PSPO I EXAM STUDY PACK 2024| 1200+ EXAM QUESTIONS WITH 100% CORRECT CHOICE GRADED A+

 1 keer verkocht
  • Vak
  • PSPO I, PSM I E
  • Instelling
  • PSPO I, PSM I E

PSPO I, PSM I E PSPO I EXAM STUDY PACK 2024| 1200+ EXAM QUESTIONS WITH 100% CORRECT CHOICE GRADED A+

Voorbeeld 4 van de 200  pagina's

  • 15 september 2024
  • 200
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • PSPO I, PSM I E
  • PSPO I, PSM I E
avatar-seller
Vady
PSPO I, PSM I E PSPO I EXAM STUDY PACK 2024|
1200+ EXAM QUESTIONS WITH 100% CORRECT
CHOICE GRADED A+

When a product grows, it is quite possible that the PO will get help from other Product
Managers and others in the organization who interact regarding the customer facing activities
and knowledge of the product marketplace. Is it a good idea for the PO to proxy or outsource
some of their PO Scrum Team duties to these people (for example, Scrum Team facing duties)?
<CORRECT CHOICE> No


It is a good practice to have at least two Product Owners on big projects. <CORRECT CHOICE>
False


Imagine the following situation. At the Sprint Retrospective meeting the Scrum Team identified
some improvements that can be done. What should the Scrum Team do? Select the best option.
<CORRECT CHOICE> Make sure the Sprint Backlog for the next Sprint includes at least one high
priority process improvement.


The Scrum Master should not allow the Product Owner to attend the Sprint Planning if the PO is
not ready with a Sprint Goal. Is this true or false? <CORRECT CHOICE> False


Product Backlog Refinement ... <CORRECT CHOICE> Is an ongoing process,


Takes no more than 10% of the capacity of the Development Team


Is the act of adding detail, estimates, and order to Product Backlog items


Who is responsible for creation of the Definition of "Done"? <CORRECT CHOICE> The
Development Team


Who is responsible for crafting the Sprint Goal at the Sprint Planning? <CORRECT CHOICE> The
Scrum Team

,What is the essence of Scrum? -Answer✅ A small team of people that is highly flexible and
adaptive


How does the Product Owner communicate his marketplace knowledge to the Scrum Team
(select three)? <CORRECT CHOICE> Sprint Reviews


Product Backlog Refinement


Daily ad hoc interactions


Who is responsible for managing the Product Backlog? <CORRECT CHOICE> The Product Owner


What are Product Backlog features? <CORRECT CHOICE> It is dynamic


As long as a product exists, its Product Backlog also exists


It is never complete


Where Scrum can be used? <CORRECT CHOICE> Managing the operation of an organization
Development of software and hardware
Development and sustaining of Cloud and other operational environments
Development of products and enhancements
Research and identifying of viable markets, technologies, and product capabilities
Development of almost everything we use in our daily lives as individuals and societies


What provides guidance to the Development Team on why it is building the Increment? -
Answer✅ The Sprint Goal

,All the Scrum Teams working on the same product should have the same Sprint length. -
Answer✅ False


What happens during the Sprint? <CORRECT CHOICE> Quality goals do not decrease


No changes are made that would endanger the Sprint Goal


Scope may be clarified and re-negotiated between the Product Owner and Development Team
as more is learned


What are the three most applicable characteristics of the Product Owner? <CORRECT CHOICE>
Product Marketplace Expert


Product Value Maximizer


Lead Facilitator of Key Stakeholder Involvement


What is the order of items in the Product Backlog? <CORRECT CHOICE> Less valuable and most
unclear items at the bottom


What could be a source of requirements for any changes to be made to the product? -
Answer✅ The Product Backlog


Who is allowed to participate in the Daily Scrum? <CORRECT CHOICE> The Development Team


What does Burn-down Chart show? <CORRECT CHOICE> How much work remains till the end
of the Sprint


Which KVA categories should the Product Owner consider to measure and track the creation
and delivery of value to the market place (select three)? -Answer✅ Time-to-Market

, Ability to Innovate


Current Value


Select the two meetings in which people outside the Scrum Team are allowed to participate. -
Answer✅ The Sprint Planning


The Sprint Review


What does Product Backlog management include? <CORRECT CHOICE> Optimizing the value of
the work the Development Team performs


Ordering the items in the Product Backlog to best achieve goals and missions


Ensuring that the Product Backlog is visible, transparent, and clear to all, and shows what the
Scrum Team will work on next


The Scrum Team consists of <CORRECT CHOICE> The Product Owner


The Development Team


The Scrum Master


What happens when a Sprint is cancelled? <CORRECT CHOICE> If part of the work is potentially
releasable, the Product Owner typically accepts it


Any completed and "Done" Product Backlog items are reviewed


All incomplete Product Backlog Items are re-estimated and put back on the Product Backlog

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Vady. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor $18.49. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 63950 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis
$18.49  1x  verkocht
  • (0)
In winkelwagen
Toegevoegd