100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED GREEN ASSOCIATE STUDY GUIDE $10.09   Add to cart

Exam (elaborations)

LEED GREEN ASSOCIATE STUDY GUIDE

 6 views  0 purchase
  • Course
  • LEED GREEN ASSOCIATE
  • Institution
  • LEED GREEN ASSOCIATE

LEED GREEN ASSOCIATE STUDY GUIDE...

Preview 3 out of 25  pages

  • September 16, 2024
  • 25
  • 2024/2025
  • Exam (elaborations)
  • Unknown
  • LEED GREEN ASSOCIATE
  • LEED GREEN ASSOCIATE
avatar-seller
luzlinkuz
LEED Categories: ANSWER 1. Location and Transportation.
2. Sustainable Sites
3. Water Efficiency

4. Energy and Atmosphere

5. Materials & Resources

6. Indoor Environmental Quality.

7. Innovation in Design

8. Regional Priorities


Green building evaluation is based on the impacts on people (social benefits),
the planet (environmental benefits), and profit (economic benefits). LEED-
certified projects satisfy these three sustainability goals and are the basis for our
definition of a green building. - ANSWER Triple Bottom Line.

Life Cycle Assessment (LCA) - ANSWER assesses the environmental impact
of a service, material, or product across its full life cycle. Life cycle evaluation
assesses a material's life cycle in terms of:

>Energy

> Emissions

> Waste


Life Cycle Cost (LCC) - ANSWER An evaluation of construction expenses
from "cradle to

grave," life cycle costs take into account everything from

Initial costs, health concerns, and productivity to

,Possible building reuse after demolition.


Embodied energy - ANSWER is energy consumed.

Throughout the various phases of a material's existence

cycle and is included in the cycle assessment.


ANSWER Value engineering is the process of reducing project costs, which
often occurs during the building phase and has an impact on the project's actual
value. Green technology and features are frequently 'value engineered' out of the
design process since meeting the local building code is the most significant part
of the structure.



Owner's Program Requirements (OPR): - ANSWER The set of goals and
requirements established by the owner or customer. This program provides the
information required for the project team to begin the pre-design process. It
specifies the project's aims, environmental vision, budget, schedule, and the
physical characteristics of its internal and external areas.


LEED: Leadership in Energy and Environmental Design


Project Minimum Requirements (MPRs) - ANSWER MPRs are necessary and
define the

Minimum project criteria required for certification.


The three stages of credit application: - ANSWER 1. Predesign – Discovery

2. Schematic Design: Design and Construction

3. Feedback Mechanisms: Operations and Performance Monitoring.


Design Charrette: - A brainstorming session held at the

, The start of a project to establish project goals, exchange information, and
handle difficulties. It's essentially a predesign meeting.



IP comprises three basic phases: answer discovery, implementation, and
performance feedback.


ANSWER Open loop systems are linear loops in which resources are harvested,
manufactured, used, and wasted. It is known as the Cradle to Grave open loop.
Open loops are deemed unsustainable.


ANSWER Closed loop systems are circular loops in which resources are
harvested, manufactured, used, and then reused or recycled. It is known as the
Cradle to Cradle closed loop. It is more sustainable and environmental.

responsible


A brownfield site is a previously utilized or developed property that may be
contaminated with

dangerous waste or pollution and has the ability to be reused after any
hazardous substances, pollutants, or contaminants are remediated.


Infill site - ANSWER a previously established site that was built on and leveled,
or a site in-between existing

structures. It is fundamentally a gap in the constructed environment. Building
on infill locations protects undeveloped land.

can take advantage of the existing infrastructure, including roads, utilities, and
other services. Seventy-five percent of the site must be previously developed.


LEED for Neighborhood Development Location - LTc1 - ANSWER A project
can earn all of the points available in the overall LT credit.

category by choosing a location located within the LEED

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller luzlinkuz. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.09. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73918 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.09
  • (0)
  Add to cart