100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Power engineering 5th class final exam questions and answers $13.99   Add to cart

Exam (elaborations)

Power engineering 5th class final exam questions and answers

 1 view  0 purchase
  • Course
  • Power Engineering 5th Class
  • Institution
  • Power Engineering 5th Class

Power engineering 5th class final exam questions and answers

Preview 3 out of 28  pages

  • September 18, 2024
  • 28
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Power Engineering 5th Class
  • Power Engineering 5th Class
avatar-seller
GUARANTEEDSUCCESS
Power engineering 5th class
final exam questions and
answers
Cast-iron sectional boilers have flue gas passages which - answer
Increase heat transfer


Steel plate heating boilers have thin steel installed in the - answer
Firetubes to give the gases a swirling motion


The vertical firetube boiler has a cylindrical shell with tubes
connected between the - answer Upper and lower tube sheets


Vertical firetube boilers have an advantage when___________ is
limited. - answer Floor space


The "A" type boiler is constructed with _________ drums. - answer
three


In general construction the Firebox boiler is not unlike
the____________ boiler. - answer locomotive


A modular cast-iron heating boiler - answer Consists of a number of
horizontal sectional cast-iron boilers


The HRT boiler is classified as a _______ pass boiler. - answer two

,The boilers or modules in a multiple heating boiler plant are: -
answer Most typically connected in parallel between the supply and
return header


The switch in the operating control of a steam boiler is closed by: -
answer Falling steam pressure


A thermocouple consists of two dissimilar wires welded together at
one end to form a: - answer Hot junction


A heating boiler must have a permanently attached marker
indicating: - answer Lowest permissible water level


What is the name given to the component that coordinates and
sequences the boiler operation? - answer Programming controller


On a hot water boiler, the highest value on the graduated scale of
the pressure gauge shall not be less than ______ times the pressure
at which the pressure relief valve is set. - answer 1.5


The programmed startup sequence of oil-fired boilers with no pilot
light is as follows: - answer 1. The operating control closes a switch
2. The load relay energizes the ignition transformer, fuel oil shut-off
valve, and motor driving the air fan and fuel pump
3. The spark from the ignition transformer ignites the main burner
4. The flame detector senses the flame and causes the flame relay
to close5. The ignition transformer is then de-energized


The boiler vent valve is used for the purpose of allowing: - answer
Air to escape while filling

, If for any reason, the burner should go out during normal operation,
or the fuel should fail to ignite during startup: - answer The fuel to
the burner must be shut off immediately


The discharge piping from the relief valve should be piped to a safe
point for disposal and can be: - answer Terminated above a floor
drain


The time taken for the automatic pilot valve to close in the event of
a loss of flame detection is about ______ seconds - answer 10


The boiler firebox, gas passages and chimney should be thoroughly
cleaned by wire brushing and: - answer Vacuuming


Leakage of a few drops a minute leakage from the packing gland of
circulating pumps is desirable to prevent drying out of packing and:
- answer Scoring of the shaft


Boiler explosions may be listed under two general classifications: -
answer Furnace explosions and Pressure explosions


If the water level in a steam boiler is found to be below the gauge
glass, the boiler should be: - answer Shut down immediately


When inspecting the fireside of the boiler the surfaces are examined
for bulges or blisters which would indicate: - answer Overheating


Which of the following is done to prevent excessive stresses of
boiler metal due to uneven expansion? - answer Warm the boiler up
as slowly as possible


The dye penetrant, entrapped in a crack, is brought to the surface
by the action of the: - answer Developer

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GUARANTEEDSUCCESS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart