AHERA - ANSThe Asbestos Hazard Emergency Response Act. Forty CFR Part 763, Subpart E.
Started 1986 and calls for that all faculties, grades K-12 (non-earnings), be inspected for the
presence of ACBM (asbestos-containing building material).
ACBM - ANSAsbestos Containing Building Material
ASHARA - ANSThe Asbestos School Hazard Abatement Reauthorization Act. Started 1990,
effective Nov. 1992, requires that an accepted Building Inspector carry out any asbestos
inspection conducted in a public or industrial constructing. Extended the education requirement
to cover asbestos workers, supervisors, and inspectors in public and commercial homes.
("Under the ASHARA revisions AHERA's education requirements now observe to all persons
operating with asbestos in public and business buildings...")
Increased wide variety of hours required for asbestos employee and manager schooling to 32
and 40 hrs respectively.
Building Inspector Responsibilities (AHERA & ASHARA) - ANS1. Determining whether ACBM is
found in a building
2. Assessing the physical characteristics of the ACBM in the constructing.
A building inspection includes: - ANS1. Investigation of data for the identification of ACBM
2. A bodily and visual inspection of the constructing for suspect substances
3. Sampling and analyzing suspect materials to check for asbestos
4. Assessing the circumstance and area of the ACBM and different characteristics of the
constructing
Management Planner Role - ANSUses data from the building inspection to estimate the diploma
of present day or potential danger posed through the ACM and develop a plan for managing the
ACM. After ACM is showed, create O&M plan, remains in effect till ACM is removed.
OSHA - ANSOccupational Safety and Health Administration - Protects people
How AHERA influences your paintings/changed things: - ANS1. Defines ACM as being more
than 1%.
2. Lays out 5 control methods: operations and maintenance, enclosure, encapsulation, restore,
and elimination.
Three. Describes clearance air sampling at quit of job with aggressive air sampling and a TEM.
4. Regulates education classes like this one and calls for this training for all employees working
with asbestos (excludes unmarried-circle of relatives houses)
, What are the five manage techniques for asbestos, and what laid them out? - ANSO&M,
enclosure, encapsulation, repair, and elimination. AHERA created.
TEM - ANSTransmission Electron Microscope/Microscopy. May be used to discover smaller
fibers of asbestos.
ASHAA - ANSAsbestos School Hazard Abatement Act. 1984, Directed EPA to help colleges
carry out their asbestos hazard responsibilities.
MAP - ANSModel Accreditation Plan. From EPA, stated now every person doing matters with
asbestos need to adhere, no longer simply schools.
Public and industrial homes: - ANSAll homes aside from school buildings and condo homes with
more than 10 units.
NESHAP - ANSNational Emissions Standard for Hazardous Air Pollutants. Forty CFR Part 61,
Subpart M
How NESHAP influences your paintings/modifications things: - ANS1. Defines any job at the
least a hundred and sixty sqft (one hundred in SoCal under SCAQMD), 260 lf, or 35 cf as a
huge task
2. Asbestos must be wet before taken down and sealed in airtight container
three. Employer must notify EPA of the job 10 operating days earlier than begins (notify even
though no asbestos for a demo)
four. Waste bags need to be classified with the vicinity of the activity and call of waste generator,
be 6 mil thick, say "Danger
carries asbestos fibers
keep away from developing dust
cancer and lung disease risk"
4. Buildings musts be inspected for asbestos previous to demo or reno.
5. Requires there be no seen emissions to the outside air all through elimination
Buildings included under NESHAP (and exclusions) - ANSExcluded: private houses and rental
homes with 4 or less devices (Except those are covered still in SoCal under SCAQMD)
Included: Institutional Buildings (hospitals, schools), commercial buildings (workplaces, rental
buildings), industrial buildings (warehouses, factories).
Removal before reno or demo rule & exceptions - ANSAll RACM must be eliminated before
demo or reno of a building if the quantity of ACM is greater than 160 sqft, 260 lf, or 35 cf
Exception: Does now not need to be eliminated if it is Cat I nonfriable ACM (packing, gaskets,
asphalt roofing, vinyl - have flexibility and may not emerge as DUST if hit), on a thing packed in
concrete, now not on hand for checking out, no longer located before demo, or Cat II nonfriable
(which might be not likely to come to be crumbled, or decreased to powder for the duration of
demo).