EEST 112 ESPA UPDATED Actual Exam Questions and CORRECT Answers On a construction site what does OSHA require of All Temporary 120v, 15A, and 20A receptacle Outlets? - CORRECT ANSWER- Protection by a ground fault circuit interrupter To properly determine maximum hole size, what are the fini...

[Show more]

Preview 2 out of 5  pages

  • September 22, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • EEST 112 ESPA
  • EEST 112 ESPA
avatar-seller
MGRADES
EEST 112 ESPA UPDATED Actual Exam
Questions and CORRECT Answers
On a construction site what does OSHA require of All Temporary 120v, 15A, and 20A
receptacle Outlets? - CORRECT ANSWER- ✔✔Protection by a ground fault circuit
interrupter


To properly determine maximum hole size, what are the finished dimensions of a standard
wood stud? - CORRECT ANSWER- ✔✔1.5 by 3.5


Which of the following should be used to create 1/4" holes in wall studs for cables? -
CORRECT ANSWER- ✔✔Power drill with auger bit


Which of the following describes the reduction of the signal level as it passes down the
cable? - CORRECT ANSWER- ✔✔Attenuation


Which of the following should be followed when data or signal cable must be located near
AC power lines? - CORRECT ANSWER- ✔✔Signal / data cables should cross AC power
cables at 90 degrees


what is the hazard in using Staples to install an RG-6 coaxial cable? - CORRECT ANSWER-
✔✔Pinching of the dielectric will change the impedance of the cable and interfere with the
proper performance


which of the following should be true of the structured wire panel once it is installed? -
CORRECT ANSWER- ✔✔Should be at the height that is easy to service


Which of the following should be done during the trim out phase of the project? - CORRECT
ANSWER- ✔✔Install wall plates


Which of the following should be done when connecting a bare, stranded wire to a screw
terminal? - CORRECT ANSWER- ✔✔Wrap the wire so the tightening of the screw will draw
the wire around the screw

, which of the following wall anchors would typically support the greatest load when mounting
a component on a hollow interior wall? - CORRECT ANSWER- ✔✔Toggle bolt


When electrical issue arises at the job site, which of the following will be the final authority
to resolve the issue? - CORRECT ANSWER- ✔✔Authority having jurisdiction


Which of the following is the most commonly used connector to terminate shielded line-level
cable a fully balanced configuration? - CORRECT ANSWER- ✔✔XLR type


What minimum National electrical code rating must a wire run in a riser in a multi-family
dwelling of units meet? - CORRECT ANSWER- ✔✔CL-2R or CL-3R



Which of the following describes Cat 5 cable? - CORRECT ANSWER- ✔✔4 wire


What would affect the change in voltage from the beginning to the end of The Wire? -
CORRECT ANSWER- ✔✔Resistance


when installing an impedance matching volume control, the signal should flow through the
equipment in which of the following orders? - CORRECT ANSWER- ✔✔Amp to volume,
control to speaker


Which of the following is included during the rough in phase of a project? - CORRECT
ANSWER- ✔✔Site walkthrough verify locations



An RJ45 modular Jack has how many conductors? - CORRECT ANSWER- ✔✔8


A wire gauge is used to verify the measurement of which of the following? - CORRECT
ANSWER- ✔✔The diameter of the wire


which distance is the threshold for maximum bandwidth for Cat5 cable from the data Outlet
to the patch panel? - CORRECT ANSWER- ✔✔295 feet / 90 meters

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller MGRADES. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart