100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED GA Practice Test Questions And Correct Accurate Detailed Answers. $14.49   Add to cart

Exam (elaborations)

LEED GA Practice Test Questions And Correct Accurate Detailed Answers.

 5 views  0 purchase
  • Course
  • LEED VA GA
  • Institution
  • LEED VA GA

Except for LEED BD+C: Core and Shell, what percent of the project's gross floor area must be complete by the time of certification? - correct answer At least 60% of the project's gross floor area What is the most important phase of the integrative process? - ...

[Show more]

Preview 3 out of 16  pages

  • September 23, 2024
  • 16
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • LEED VA GA
  • LEED VA GA
avatar-seller
RealGrades
LEED GA Practice Test Questions
Except for LEED BD+C: Core and Shell, what percent of the project's gross floor area must be complete
by the time of certification? - correct answer At least 60% of the project's gross
floor area



What is the most important phase of the integrative process? - correct answer The
discovery phase



Which tasks may a Green Associate be requested to help with? - correct answer
Document and write project profiles, case studies and press releases; communicate green building
concepts to team/colleagues; create a library of sustainable building materials; assist others with
sustainability goals; serve as a green advocate; stay updated on LEED and general green building
strategies; navigate LEED Online; assist with LEED correspondence; assist with the LEED documentation
process



During what stage is construction pollution prevention planned? - correct answer
Site design and development stage



What does a building product disclosure include? - correct answer Raw materials
sourcing, material ingredients, environmental product disclosure



What do the Project Surroundings and Public Outreach sections include? - correct answer
Environmental impacts, environmental codes, values of sustainable design and regional design



What must renewable energy practices consider? - correct answer Demand
response, green power, and carbon offsets



At what point in the LEED process are LEED Interpretations created? - correct answer
LEED Interpretations can be made after project registration



LEED Green Associates advocate environmental practices to whom? - correct answer
Clients, team members and the general public

,Which standards support LEED? - correct answer American Society of Heating,
ASHRAE, SMACNA guidelines, Green Seal, Energy Star, HERs



In the site design and development stage, what should be considered? - correct answer
Construction activity pollution prevention, habitat conservation and restoration, exterior open space,
rainwater management, exterior lighting, heat island reduction



What types of building spaces are considered in the energy and atmosphere credit category? - correct
answer Private offices, individual space, shared multi-occupant spaces



What types of reuse are considered in the materials and resources credit category? - correct answer
Building reuse, material reuse, interior reuse, furniture reuse



What types of waste are considered in the materials and resources credit category? - correct answer
Construction and demolition, maintenance and renovation, operations and ongoing



Which codes are applicable to LEED buildings? - correct answer Building, plumbing,
electrical, mechanical, fire protection, green building



How can indoor air quality be improved? - correct answer Managing ventilation
levels, tobacco smoke control, use of low-emitting materials, green cleaning practices



Regional emphasis should be placed on which credit categories? - correct answer
Sustainable Sites, Materials and Resources



What does commercial construction in the United States account for? - correct answer
14% of potable water consumption, 30% of waste output, 38% of CO2 emissions, 40% of raw material
use, 24 - 50% of energy use and 72% of electricity consumption



What are the recommended steps for devising a LEED work plan? - correct answer
(1) Initiate discovery phase, (2) Select LEED rating system, (3) Check minimum program requirements,
(4) Establish project goals in a goal-setting workshop, (5) Define LEED project scope and boundary, (6)
Develop the LEED scorecard and determine target certification level, (7) Continue the discovery phase,

, (8) Continue iterative process, (9) Assign roles and responsibilities, (10) Develop consistent
documentation and track ongoing progress, (11) Perform quality assurance review and submit for
certification



What are some of the most common special project situations? - correct answer
Mixed Use - Possible to use other rating systems for certain credits; Multi-tenant Complex; Incomplete
Spaces - Requires supplemental letter of commitment or nonbinding tenant guidelines; Projects with
several physically distinct structures - Project must be analyzed as a whole



Does the development footprint include semi-permeable paving? - correct answer
Pavement that is at least 50% permeable is excluded from the development footprint



Is land that has been voluntarily excluded from development considered buildable land? - correct
answer Yes, land set aside voluntarily for open space is considered buildable land



How do density calculations vary based on whether a project is residential or non-residential? - correct
answer Residential projects calculate density as the number of dwelling units
divided by residential land area, while non-residential projects use the floor area divided by the
buildable land area (FAR); Combined density for residential and non-residential areas uses FAR



How do most credits group building occupants? - correct answer Regular building
occupants and Visitors



Who is considered to be a regular building occupant? - correct answer Employees,
Regular Volunteers, Residents, Primary and Secondary School Students, Hotel Guests, Inpatients



Who is considered to be a visitor? - correct answer Retail Customers, Outpatients,
Periodic Volunteers, Higher Education Students (except for dorms)



How do building occupancy calculations vary between regular and transient occupants? - correct answer
Occupancy with regular building occupants is measured in FTE's (Full-Time Equivalent), while visitor
occupancy is expressed as daily averages and daily peak totals

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller RealGrades. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.49
  • (0)
  Add to cart