Select the four fundamental stages of the construction management process - CORRECT ANSWER-Pre-Construction, Procurement, Construction, and Post-Construction
The design process has four distinct stages, what are they? - CORRECT ANSWER-Programming and feasibility, Schematic design, Design develop...
CM Docs Exam Questions with 100%
Accurate Solution
Select the four fundamental stages of the construction management process -
CORRECT ANSWER-Pre-Construction, Procurement, Construction, and Post-
Construction
The design process has four distinct stages, what are they? - CORRECT ANSWER-
Programming and feasibility, Schematic design, Design development, and Contract
documents
Name two procurement instruments used to buy out a job - CORRECT ANSWER-Sub-
contracts & Purchase orders
Which occurrence marks the official completion of the project? - CORRECT ANSWER-
Certificate of substantial completion
What activities usually occur during the mobilization stage? - CORRECT ANSWER-Set
up field office, Secure site, Provide & place portable toilets
Select the best definition of "Punch List" - CORRECT ANSWER-Minor adjustments,
repairs, and work items that must be completed
Select best definition of "substantial completion" - CORRECT ANSWER-The point at
which all punch list work has been completed and the owner can occupy or take
possession of the new facility
Select the best definition of "As-built drawings" - CORRECT ANSWER-Record drawings
completed by the contractor and turned over to the owner at the end of the project that
identify changes to original plans and specifications
,Select the following that are usually included in the final documentation to the owner. -
CORRECT ANSWER-Warranties, Operation manuals, Inspection and testing reports,
and As-built drawings
___________ keep track of and manages the completion of all loose ends, minor
repairs, and adjustments at the end of the job. - CORRECT ANSWER-Punch lists
A contract is entered into whereby the Design and Scope are partially undefined, the
Owner holds a contract with the A/E, the Owner holds the contracts with each trade and
the Owner also holds a contract with a management service company to perform the
trade coordination, cost control and scheduling services. What is this project delivery
called? - CORRECT ANSWER-Construction Management
In the Agency CM delivery system, the CM (not the owner) contracts with the general
contractor - CORRECT ANSWER-False
Which delivery method is the construction administrator most like a consultant? -
CORRECT ANSWER-CM Agency
Which of the following is a major difference between a CM agency and a CM at risk? -
CORRECT ANSWER-One caps the construction costs the owner is required to pay
One of the advantages of the CM delivery system is the excellent value engineering. -
CORRECT ANSWER-True
Who determines what method of delivery is used on a project? - CORRECT ANSWER-
Owner
Design-Build contracts can be used in any public works projects in any states. -
CORRECT ANSWER-False
A design-build firm may be (check all that apply): - CORRECT ANSWER--a joint
venture contract between a con- tractor and a design firm.
-a single firm with both design and construction capability.
, -a design firm that sub-contracts the construction portion to a construction contractor
-a construction contracting firm that subcontracts the design work to an architect or
engineer firm.
The principal barrier to the use of design-build process in the public sector lies in the
difference between the procurement laws governing the selection process for AE and
GC. - CORRECT ANSWER-True
In the DBB delivery system, the designer works for the general contractor - CORRECT
ANSWER-False
The first company that the owner hires in the DBB delivery system is the general
contractor. - CORRECT ANSWER-False
The contractual relationship in DBB governed by the conditions of the contract is
between: - CORRECT ANSWER-Owner and contractor
Under DBB, the owner has a contractual relationship with suppliers and subcontractors.
- CORRECT ANSWER-False
Under DBB, there being no contractual relationship between the A/E and the
contractor,there is also no contractual relationship between the A/E and the
subcontractors and suppliers. - CORRECT ANSWER-True
The Owner wants to Fast-Track a construction project., Which project delivery
systembest supports this process? - CORRECT ANSWER-Design-Build
Which statement is true about the Design-Build delivery method? - CORRECT
ANSWER-There is a sole source for fault for building system failures
The most common method to pay for a designer is Fixed Lump Sum fee. - CORRECT
ANSWER-True
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller remojudytask. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.