Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Chapter 13 Water Shuttle Operations Questions and Answers 100% correct

Beoordeling
-
Verkocht
-
Pagina's
6
Geüpload op
27-09-2024
Geschreven in
2024/2025

Chapter 13 Water Shuttle Operations

Instelling
Mobile Water Supply
Vak
Mobile water supply

Voorbeeld van de inhoud

Chapter 13 Water Shuttle Operations

1) The decision in utilizing a relay pumping operation or a water shuttle operation is
based on - answer The distance to the water supply.
The required fire flow.
The type of equipment a particular jurisdiction uses.
All the above.

2) Which of the following would be considered a primary type of apparatus required to
operate an effective water shuttle operation - answer A and C.

3) Fill site tenders should have a minimum pump capacity of - answer1,000 gpm.

4) Vehicle weight restrictions for tenders generally limit single rear axle apparatus to a
maximum capacity of - answer2000 gallons.

5) Sizes of tenders are normally based on all but which of the following criteria - answer
Jurisdiction capital budgets.

6) Where tanks of 2000 gallon capacity or larger are used, which of the following truck
configurations does not apply - answerSingle rear axle.

7) Tenders with __ gpm or larger fire pumps are often called pumper-tenders. -
answer750.

8) NFPA 1901 requires one large tank discharge (dump valve) be installed on a tender.
It is highly recommended that each tender be equipped with at least __ dump valves. -
answer3

One on the left, right in the rear of the apparatus.

9) Remotely operated valves may be operated using which of the following -
answerElectrical power.
Hydraulic power.
Pneumatic power.
All of the above.

Answered change from last version.

10) Which of the following statements regarding Jet-assisted pumps is not true -
answerWater can be discharged without engaging the pump and will result in the same
flow rate as gravity dump systems.

, Water can be discharged without engaging the pump and will result in a lower flow rate
as gravity dump systems.

11) Which of the following would NOT be considered a crucial decision in setting up a
water shuttle - answerCurrent weather conditions.

Also the number of vehicles necessary to maintain a constant supply of water at the
scene.

12) If a fire scene is located down a narrow lane, driveway, or dead-end street, which of
the following is the most advantageous location for a dump site - answerAt the nearest
intersection.

13) When possible, select a fill site that is capable of supplying at least __ gpm, the rate
in which NFPA 1901 specifies that the tender should be filled. - answer1000.

14) A __ route of travel is considered to be the optimum method for conducting a water
shuttle operation. - answerCircular pattern.

15) When operating from a hydrant, the driver/operator must connect, at a minimum, a
____ diameter intake hose between the hydrant and the pumper intake. - answerLarge.

16) When positioning to draft at a static water supply, driver/operators must seek a
position that maximizes the amount of flow to the tender and - answerOne that requires
a minimum amount of lift.

17) Which procedure ensures that there is no loss of prime during drafting operations -
answerThe booster line or some other type of small discharge remains flowing
continuously.

This line should be in constant view of the driver/operator.

18) Which of the following is NOT a consideration by the tender driver/operator as to
where to park when arriving at a fill site - answerThe size of the tender in relation to the
fill site.

19) When using LDH to connect to tenders with direct tank filled intakes, only one line is
generally required and should be equipped with a ___ between the last sections of the
hose to act as a - answerA and B.

20) Its generally only necessary to lay one LDH from the fill site pumper to the fill
location - answerIf the tenders being filled have LDH direct tank intakes.

Geschreven voor

Instelling
Mobile water supply
Vak
Mobile water supply

Documentinformatie

Geüpload op
27 september 2024
Aantal pagina's
6
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Onbekend

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Thumbnail
Voordeelbundel
Bundle of Mobile Water Supply Exam 2024
-
36 2024
$ 553.04 Meer info

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Resolution Nursing
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
302
Lid sinds
2 jaar
Aantal volgers
187
Documenten
15931
Laatst verkocht
2 weken geleden
NURSING VIEW

In my shop you will find documents, package deals, nursing courses, assigments,flashcards and all revision materials .You are welcome

4.0

60 beoordelingen

5
38
4
4
3
5
2
4
1
9

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen