100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI Written Exam Questions With Verified Answers. $10.49   Add to cart

Exam (elaborations)

ACI Written Exam Questions With Verified Answers.

 1 view  0 purchase
  • Course
  • ACI
  • Institution
  • ACI

ACI Written Exam Questions With Verified Answers. The sensor of the temperature measureing device shall be submerged a minimum of ____ in - answer3 (75mm) The temperature measureing device shall have a capacity of measuring temperature of freshly mixed conrcrete to +-_____ degrees F throught a...

[Show more]

Preview 2 out of 9  pages

  • September 27, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ACI
  • ACI
avatar-seller
Brainbarter
©BRAINBARTER 2024/2025




ACI Written Exam Questions With Verified
Answers.


The sensor of the temperature measureing device shall be submerged a minimum of ____ in -
answer✔3 (75mm)
The temperature measureing device shall have a capacity of measuring temperature of freshly
mixed conrcrete to +-_____ degrees F throught a range of _____ - answer✔1(.5 degrees C), 30-
120 (0-50 degrees C)
The temperature measuring device shall be calibrated____, or whenever there is a question of
_____ - answer✔annually, accuracy

The temp of concrete may be measured in a wheelbarrow - answer✔true

the temp of concrete may be measured in a wall form - answer✔true
A composite sample of concrete is required even if the only purpose for obtaining the sample is
to determine temp. - answer✔false

What must be done to the sample container prior to sampling the concrete - answer✔dampen
(with water)
what must be done to the concrete surrounding the temp measuring device after the device has
submerged - answer✔Press concrete around measuring device

How long must the temp device remain in the concrete - answer✔at least 2 minutes (but no more
than 5)

After temp of concrete is read, what then is required - answer✔reporting of temp

the temp of concrete to be measured to the nearest ____degree F - answer✔1 (.5 degree C)

According to the ASTM C1064 what is one reason to take the temp of concrete - answer✔verify
conformance to a specified requirement for temp

A max temp of concrete is specified in ASTM C1064 - answer✔False

The sample of concrete used for temp determination must be rodded 25 times - answer✔False

, ©BRAINBARTER 2024/2025


Sampling by this method is required when tests are to be made to determine ____ with
specification requirements - answer✔compliance
The method covers sampling from four types of mixers which are _____, _____, ____, and
_______ - answer✔stationary mixes, paving mixers, revolving drum mixers and open top mixers
The maximum allowable time between obtaining the first and final portions of a composite
sample is ______ minutes - answer✔15
Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample
- answer✔True
The maximum elapsed time allowed between obtaining the final portion of the composite sample
and beginning the tests for slump, temp, and air content is ______ minutes - answer✔5
the molding of strength test specimens shall begin within ____ minutes after fabricating the
composite sample - answer✔15

The concrete sample must be protected from contamination and ____ - answer✔rapid
evaporation

The minimum size sample test specimen is - answer✔28 L (1ft^3)
when sampling from a stationary mixer the batch must be sampled at _____ or more regularly
spaced intervals during discharge of the middle portion of the batch - answer✔2
The composite sample for a paving mixer must represent a minimum of _____ different portions
of the batch of concrete taken from the pile after discharge - answer✔5
When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of
______ regularly spaced intervals during discharge of the middle portion of the batch -
answer✔2
Concrete samples from a truck mixer must be obtained before any water or admixtures are added
to the mixer at the job site - answer✔False
The composite sample from a truck mixer must be obtained from the _____ portion of the batch -
answer✔Middle
When the concrete contains aggregate larger than permitted for a particular test method, the
sample fo concrete must be ______ ______ before making the test - answer✔Wet Sieved
The slump test is applicable to plastic concrete with a max aggregate size of ____ in -
answer✔1.5 in (37.5 mm)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Brainbarter. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78310 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart