true - Answers The correct answer is the general attribute for Design-Build is Single Source Delivery.
true - Answers Some of the essential concepts of Design-Build are Single Point of Responsibility, Design process, Design-Cost Relationship, ...
Project Delivery Exam Questions and Answers Graded A+
true - Answers The correct answer is the general attribute for Design-Build is Single Source Delivery.
true - Answers Some of the essential concepts of Design-Build are Single Point of Responsibility, Design
process, Design-Cost Relationship, and contract controls
true - Answers Design factors include, but are not limited to, level of design in the RFP, Shifting Risk,
Design Management, and the person controlling the details of the design
true - Answers The 4 design phases in construction are Programming, Schematic Design, Design
Development, and procurement of the Construction Documents
owner - Answers When the documents are 100% complete, who owns the most amount of risk?
all of the above - Answers What are some of the factors that can influence people's decision to trust?
History/Experience
Competence/Ability Similarities & Differences Relative Power or Authority
D - Answers 1. What project delivery method is it when the designer, contractor and owner sign one
multi party contract?
A) Design Bid Build B) CM at Risk C) Design Build D) Integrated project delivery
C - Answers How many components of total construction costs are there? A) 1B)2C)3D)4
A - Answers What is the typical reimbursement used with Design-Bid-Build?
A) Lump sum B) GMP C) Target price
All of the above - Answers The five phases of the construction process are what? Mark all that apply.
A) real estate B) Financing C) Design D) construction E) Occupancy
C - Answers Under agency CM, construction phase services typically begin once the __________.
A) The BID is submitted B) the plan and specs are finished C) the pre-construction phase
is completed
A - Answers When there is overlap between two or more phases. B) When the project is ahead of
schedule C) Hiring more workers to complete project faster.
, A - Answers In the design-bid-build method of project delivery, who assumes the risk of defects in the
contract documents?
A) Owner B) Architect C) Contractor D) project manager
True - Answers There are always 3 basic parties involved in the process delivery process.
true - Answers the procurement/selection process for CM at-risk is more complex than in the Design-
bid- build delivery method.
C - Answers Like design build ___________ facilitates the ability to fast track a project. A) GMP B) BID
BUILD C) CM at Risk
The comprehensive process of assigning the contractual responsibilities for designing and constructing a
project - Answers How would you best describe project delivery?
Lump Sum - Answers What type of reimbursement is most common for projects procured with a low bid
or best value: total cost selection?
True - Answers By definition, procurement of the design-bid-build delivery method is only by low bid or
best value: total cost.
true - Answers The agent CM is responsible for furnishing the management services necessary to deliver
construction, not the overall construction of the building.
true - Answers The correct answer is that a project on the fast track when two phases are overlapped
such as design and construction.
true - Answers There are normally three phases in the design process; 1) Schematic documents phase 2)
Design documents phase 3) construction documents phase
Schematic design - Answers Which of the following design phases involves an investigation of different
design alternatives that meet the programming statement?
true - Answers In design-bid-build the owner hires a designer and controls the details of the design. In
Design-Build, it is just the opposite; the design-builder controls the details of design.
true - Answers In a Best Value Two Envelope Proposal, the technical envelope includes all non-price
factors and price envelope includes the price.
true - Answers When using Best Value procurement, both quantitative (the cost) and the qualitative (the
solution) are evaluated to select the best design-build team.
true - Answers A Request for Proposal (RFP) enables the Design-Builder to clearly understand its specific
tasks & responsibilities for a specific project.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller TutorJosh. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.