100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC Final Exam SOS Exam Question With Verified Answers $11.49   Add to cart

Exam (elaborations)

NERC Final Exam SOS Exam Question With Verified Answers

 0 view  0 purchase
  • Course
  • NERC
  • Institution
  • NERC

NERC Final Exam SOS Exam Question With Verified Answers Of the following, which control system would be affected by a difference in Net Actual Interchange and Net Scheduled Interchange? a. Automatic Voltage Regulator b. Reactive Control c. Automatic Generation Control d. Turbine Governor Con...

[Show more]

Preview 3 out of 24  pages

  • October 1, 2024
  • 24
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NERC
  • NERC
avatar-seller
Brainbarter
©BRAINBARTER 2024/2025




NERC Final Exam SOS Exam Question With
Verified Answers


Of the following, which control system would be affected by a difference in Net Actual
Interchange and Net Scheduled Interchange?


a. Automatic Voltage Regulator
b. Reactive Control
c. Automatic Generation Control

d. Turbine Governor Control - answer✔c. Automatic Generation Control


Feedback: BAL-005, Automatic Generation Control (AGC) Equipment automatically adjusts
generation in a Balancing Authority Area from a central location to maintain the Balancing
Authority's interchange schedule plus Frequency Bias. AGC is a process designed and used to
adjust a Balancing Authority Areas' Demand and resources to help maintain the Reporting ACE
in that of a Balancing Authority Area within the bounds required by applicable NERC Reliability
Standards. Governors arrest frequency deviations, but Automatic Generation Control (AGC)
maintains generation to a schedule. It does this by pulsing the generator governors to either
increase or decrease megawatt as needed.
How is the Frequency Response Obligation (FRO) of a Frequency Response Sharing Group
determined?


a. By averaging the members' FRO's.
b. By adding the individual FRO's of each member.
c. By taking the median Frequency Response Measure of the previous year.

d. By adding the member's Frequency Response Measures of the previous year. - answer✔b. By
adding the individual FRO's of each member.

, ©BRAINBARTER 2024/2025




Feedback:
NERC allows Balancing Authorities to form Frequency Response Sharing Groups (FRSGs) with
other Balancing Authorities to jointly meet their FROs. These FRSGs determine their joint FRO
by adding up the member's individual FROs.
NERC Standard BAL-001 states that a Balancing Authority's clock-minute average of Reporting
ACE reading must not exceed its Balancing Authority ACE Limit (BAAL) for more than
__________.


a. 30 consecutive clock-minutes
b. 30 clock minutes per hour
c. 15 consecutive clock-minutes

d. 90% of 10-minute periods in a month - answer✔a. 30 consecutive clock-minutes


Feedback: BAL-001, Real Power Balancing Control Performance
If a Balancing Authority needs to offset the scheduled frequency by 0.02 Hz, due to an
Interconnection wide time error correction, what adjustment can the Balancing Authority make
to participate Interconnection wide time error correction if unable to change scheduled
frequency?


a. Change the AGC mode
b. Changing the B (frequency bias) setting of the ACE equation
c. Changing the governor speed droop from 5% to 4%
d. Offset its Net Interchange Schedule(MW) by an amount equal to the computed bias
contribution during a 0.02 Hz Frequency Deviation - answer✔d. Offset its Net Interchange
Schedule(MW) by an amount equal to the computed bias contribution during a 0.02 Hz
Frequency Deviation


Feedback: Time Error Correction is when the Interconnection schedules frequency, normally
60.00 Hz to 59.98 Hz or 60.02 Hz in order to adjust clocks that may be either fast or slow due to
the frequency fluctuations of the power system. If the Balancing Authority cannot change

, ©BRAINBARTER 2024/2025


scheduled frequency which would produce -10B (+/-0.02) value, they shall offset its Net
Interchange Schedule by an amount equal to 20% of it Frequency Bias [10B (0.02)]. NERC
Standard BAL-004 and Time Monitoring Reference Document, 2016
A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a
summer day. The Net Interchange Actual for those same hours respectively were -230 MW, -275
MW, -250 MW and -270 MW. What was the Balancing Authority's Inadvertent Interchange for
the 4-hour period?


a. 25 MWs in
b. 25 MWs out
c. 6 MWs out

d. 6 MWs in - answer✔a. 25 MWs in


Feedback: Inadvertent calculation is after the hour and the difference between Net Interchange
Actual and Net Interchange Scheduled.Inadvertent for hour 1: (-230 ) - (-250) = +20Inadvertent
for hour 2: (-275) - (-250) = -25Inadvertent for hour 3: (-250) - (-250) = 0Inadvertent for hour 4:
(-270) - (-250) = -20Net for the period = - 25
Balancing Authority A is currently reading a system frequency of 59.98 Hz. Its Net Actual
Interchange is +100 MW and its Net Scheduled Interchange is +100 MW. If Balancing Authority
A's frequency bias setting is 100 MW/0.1 HZ, what is ACE?


a. -20
b. 0
c. 20

d. 2 - answer✔a. -20


Feedback: ACE = (100 - 100) - [-1000 (59.98 - 60.00)]ACE = 0 - (-1000) (-.02)ACE = 0 -
20ACE = -20
A Balancing Authority has a normal generation capacity of approximately 9400 MW and its
most severe single contingency is an 800 MW coal-fired steam unit. At 1430, with an ACE value
of 20 MW, a 600-MW generator trips off-line as the result of a generator differential. This

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Brainbarter. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart