100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
APM Question and answers already passed 2024/2025 $13.49   Add to cart

Exam (elaborations)

APM Question and answers already passed 2024/2025

 8 views  0 purchase
  • Course
  • APM
  • Institution
  • APM

APM Question and answers already passed 2024/2025 APM: Project Management Hold Harmless Agreement - correct answer A contractual agreement that transfers the liability of one party to another party; The organization or individual is not liable for damages or injuries caused by the individual...

[Show more]

Preview 3 out of 19  pages

  • October 3, 2024
  • 19
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • apm
  • APM
  • APM
avatar-seller
Academia199
APM: Project Management
Hold Harmless Agreement - correct answer ✔A contractual agreement that
transfers the liability of one party to another party; The organization or
individual is not liable for damages or injuries caused by the individual


Lease Premises - correct answer ✔The property that resides on the lease


Easement Agreement - correct answer ✔An agreement that allows limited
use of land owned by someone else


Sidetrack Agreement - correct answer ✔Contract between a railroad and a
business the railroad may service.
The business holds the railroad harmless if an accident occurs while the
railroad is using the sidetrack to deliver goods to the business.


PERT - correct answer ✔Program Evaluation and Review Technique. A
statistical tool used in project management used to analyze and represent
tasks in a given project


Roadway Pavement Management System - correct answer ✔The process of
planning the maintenance and repair of a network of roadways.
1. Inventory
2. Inspection
3. Condition Assessment
4. Condition Prediciton
5. Condition Analysis
6. Work planning

,Protestant work ethic - correct answer ✔the view that a person's duty is to
achieve success through hard work and thrift, such success being a sign that
one is saved.


management by exception - correct answer ✔a control principle that states
that managers should be informed of a situation only if data show a significant
deviation from standards


gap analysis - correct answer ✔Analyzing the current performance versus
the goal/potential performance


ABC Analysis - correct answer ✔Rating inventory in ABC or based on
importance. Inventory of organization is not of equal value.


Value Engineering - correct answer ✔An approach to solve problems
through identifying and eliminating unwanted costs while improving
functionality and quality. Value as a ratio of function to cost. Creating a life-
cycle for the product to minimize overspending.


Critical Path Method - correct answer ✔A method used to estimate the
maximum project duration and determine the amount of scheduling flexibility
on the logical network paths within the schedule model.


Productivity Ratio - correct answer ✔output/input


Downtime - correct answer ✔a period of time when a system is unavailable


Index Numbers - correct answer ✔Used to measure the changes in one or
more variable over a period of time

, Management by Objectives (MBO) - correct answer ✔a program that
encompasses specific goals, participatively set, for an explicit time period,
with feedback on goal progress


Span of Control - correct answer ✔the number of subordinates who report
directly to a manager


Scientific Management - correct answer ✔the application of scientific
principles to increase efficiency in the workplace


Bottleneck - correct answer ✔A point in the production chain where the
limited capacity in one portion causes a reduced capacity of the whole chain.


Aggregates in Bituminous Pavements are tested on... - correct answer
✔Abrasion, soundness, and deleterious material


PSI - correct answer ✔Present Serviceability Index


Minimum thickness for asphalt maintenance by U.S. Federal Highway
Administration - correct answer ✔3/4" minimum thickness


Raveling - correct answer ✔Disintegration of asphalt material from the
surface downward causing a separation of material


Management Science - correct answer ✔The careful, objective study of
management decisions and procedures in order to improve the operation of
businesses and organizations.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Academia199. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82871 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart