100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
221 FINAL MC Questions with complete solution 2024/2025 $13.49   Add to cart

Exam (elaborations)

221 FINAL MC Questions with complete solution 2024/2025

 6 views  0 purchase
  • Course
  • APSC 221
  • Institution
  • APSC 221

221 FINAL MC Questions with complete solution 2024/2025 221 FINAL MC (SPEN) When alternatives for accomplishing a specific task are being compared over one year or less (time value of money is ignored) they can be referred to as: Engineering comparisons Opportunity costs Cost concepts Prese...

[Show more]

Preview 3 out of 26  pages

  • October 6, 2024
  • 26
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • 221 final mc
  • APSC 221
  • APSC 221
avatar-seller
Carzola98
221 FINAL MC (SPEN)
When alternatives for accomplishing a specific task are being compared over
one year or less (time value of money is ignored) they can be referred to as:
Engineering comparisons
Opportunity costs
Cost concepts
Present economy studies - correct answer ✔Present economy studies


The general Price-Demand relationship can be expressed as a linear function.
- correct answer ✔True


The power-sizing technique is sometime referred to as a linear model.
True
False - correct answer ✔False


The WBS is sometimes called a work element structure.
True
False - correct answer ✔True


Which technique sums the product of several quantities or components and
adds these to any components estimated directly?
Unit technique
Power-sizing technique
Factor technique
Adding technique - correct answer ✔Factor Technique

,______ are used in the preliminary or conceptual design stage of a project.
Cost and revenue estimates
Definitive estimates
Semi-detailed or budget estimates
Order of magnitude estimates - correct answer ✔Semi-detailed or budget
estimates


CERs are excellent predictors of cost if they are correctly developed from
good historical data.
True
False - correct answer ✔True


Material costs are an example of costs that are typically included in an
engineering economy study.
True
False - correct answer ✔True


__________ is the use of historical cost data and statistical techniques to
predict future costs.
Power-sizing.
Parametric cost estimating
Selected estimating.
Historical estimating. - correct answer ✔Parametric Cost Estimating


What does Cn stand for in the above equation?
Reference year for which cost is known.
Cost or price of the item in reference year.

, Year for which the cost is to be estimated.
Estimated cost of price of the item in year being analyzed. - correct answer
✔Estimated cost of price of the item in year being analyzed.


Compound interest takes the interest accumulated in one interest period and
adds it to the principle amount used to calculate interest in the next period.
True
False - correct answer ✔True


A cash flow diagram summarizes the timing and magnitude of cash flows as
they occur over time.
True
False - correct answer ✔True


The base unit of time over which an interest rate is calculated is called the
_______.
Interest duration
Time period
Interest cycle
Interest period - correct answer ✔Interest Period


Mathematical equivalence is a consequence of the mathematical relationship
between _______.
First cost and salvage value
Sunk costs and opportunity cost
Depreciation and market value
Time and money - correct answer ✔Time and Money

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Carzola98. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart