Exam (elaborations)
CSI CDT QUESTION AND ANSWER GRADED A+
CSI CDT QUESTION AND ANSWER GRADED
A+
InsasDesign/Buildsproject,stheresissascontractualsrelationshipsestablishedsbetween:s- sCORRECTsANSWER- ThesOwnersandssinglesparty,sTypicallysasContractorsassociatedswithsansA/EnnnFF s040
ForsthesPublicssector,sWhichsmethodsissnormallysfollowedsforsthesawa...
[Show more]
Preview 2 out of 13 pages
Uploaded on
October 6, 2024
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
All documents for this subject (47)
$11.49
Also available in package deal from $23.57
Added
Add to cart
Add to wishlist
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
Also available in package deal (1)
PACKAGE DEAL FOR CSI CDT EXAM 2024/2025 FULLY UPDATED CORRECT QUESTION AND ANSWER.
1. Exam (elaborations) - Csi final exam question and answer 100% success guaranteed.
2. Exam (elaborations) - Csi cdt exam 2024/2025 fully updated correct question and answer.
3. Exam (elaborations) - csi cdt question and answer graded a+
4. Exam (elaborations) - csi cdt study info question and answer graded a+
Show more
CSI CDT QUESTION AND ANSWER GRADED
A+
InsasDesign/Buildsproject,stheresissascontractualsrelationshipsestablishedsbetween:s-
sCORRECTsANSWER-
ThesOwnersandssinglesparty,sTypicallysasContractorsassociatedswithsansA/E\n\n\nFF
s040
ForsthesPublicssector,sWhichsmethodsissnormallysfollowedsforsthesawardsofsascontract
?s-sCORRECTsANSWER-CompetitivesBiddings\n\nFFs040
ThesConstructionsManagersissnormallyshiredsby?s-sCORRECTsANSWER-
ThesOwners\n\nFFs040
Thesformsofscontractsusuallysmostsdifficultstosadministersduringsconstructionsis:s-
sCORRECTsANSWER-MultiplesPrimesContracts
InsthesSingle-
PrimescontractssituationsthesOwnersdoessnotshavesascontractualsrelationshipswithsw
hichsofsthesfollowings-sCORRECTsANSWER-Sub-contractor
Inswhichsphasesaresthesspecificationssproduced?s-sCORRECTsANSWER-
DesignsPhases-sConstructionsDocuments\n\nFFs010
Whosesresponsibilitysissitstosproducesthesshopsdrawings?s-sCORRECTsANSWER-
ThesContractor\n\nFFs010
Whichsorganizationalssystemsissusedsinsthespreliminarysstagessofsasproject?s-
sCORRECTsANSWER-UniFormat
WhosdevelopedsthesfirstsformalsUniFormat?s-sCORRECTsANSWER-
ThesAIAsandsThesCSI
WhosesresponsibilitysissthesmaintenancesofsthesrevisedsUniFormat?s-
sCORRECTsANSWER-ThesCSCsandsThesCSI
WhensissthesCSI/CSCsUniFormatsused?s-sCORRECTsANSWER-
Insthesplanningsstagesofsasproject
WhensissthesMasterFormatsused?s-sCORRECTsANSWER-
Whensorganizationsofsdetailedsconstructionsissrequiredsonsthesbasissofsmaterialssors
methods
, HowsmanysDivisionssaresfoundswithinsthesMasterFormatsSystem?s-
sCORRECTsANSWER-16
WhatswouldsbesansexamplesofsdatasfilingswithsthesMasterFormatsSystem?s-
sCORRECTsANSWER-Productsliterature,\nSweetssCatalog,\nSpecData
WhatsinformationsissfoundswithinsDivisions13sinsthesMasterFormatsSystem?s-
sCORRECTsANSWER-SpecialsConstruction
WhatsaresthesthreespartssofsthesSectionFormat?s-sCORRECTsANSWER-
General,sProductssandsExecution
InswhatspartsofsthesSectionFormatsissfoundsinformationsonssubmittals?s-
sCORRECTsANSWER-Parts1,sGeneral
ThesthirdspartsofsthesThree-PartsSectionsFormatsis:s-sCORRECTsANSWER-Execution
MasterFormatsissorganizedsinssuchsaswaysthatsasspecificationssectionscouldsbeswritte
nsat:s-sCORRECTsANSWER-Onesofsfourslevelssofscomplexity
13.sUndersPARTs3,sEXECUTION,sallsofsthesesstatementssapplysEXCEPT:\n\nA.sInclude
sparagraphssrequiringsthesContractorstosverifyssurfacessfreesofsdefectssthatswouldsres
ultsinspoorsapplications\nB.sIncludesstatementssconcerningspreparationsassprelimina
rysactionsnecessarysforsaccomplishmentsofsthesWork\nC.sIncludesactionssthatsactuall
ysaccomplishsthesWork\nD.sIncludestestsofsproductsspriorstosinstallations-
sCORRECTsANSWER-D.sIncludestestsofsproductsspriorstosinstallation
MasterFormatsissbasedson:s-sCORRECTsANSWER-Asfive-digitsnumberingssystem
AllsofsthesfollowingsshouldsbesincludedsinsProject/SitesConditionssEXCEPT:\n\nA.sExi
stingsconditionssthatsaffectsthesapplicationsofsothersmaterials\nB.sProtectionsofsmate
rialssdeliveredstosthessite\nC.sLimitationsssuchsasstemperaturesorsweathersthatsaffect
spropersinstallation\nD.sReferencesstosdocumentssaboutsexistingsstructuressorsutiliti
ess-sCORRECTsANSWER-B.sProtectionsofsmaterialssdeliveredstosthessite
AllsofsthesfollowingsaresarticlessinsPARTs1,sGENERALsEXCEPT:\n\nA.sReferences\nB.s
Submittals\nC.sSourcesQualitysControl\nD.sSequencingsandsSchedulings-
sCORRECTsANSWER-C.sSourcesQualitysControl
Divisionsnumberssaresfixed,sbutsspecificationssectionsnumberssandstitles:s-
sCORRECTsANSWER-
Aresfixedsforslevelstwosandsthreessectionssbutscansbesindividuallysselectedsforslevelsfo
urssections
Ansexamplesofsaslevelsfourssectionsis:s-sCORRECTsANSWER-
05215sOpensWebsSteelsJoists