Ammo 5 Level CDC Module 4|93 Review Exercise Questions And Answers
10 views 0 purchase
Course
Ammo 5 Level CDC
Institution
Ammo 5 Level CDC
After 463L pallets are positioned on a rollerized trailer, what can you use to secure the pallets to the trailer? - ️️MB-1 chain assemblies and/or tie-down straps
An electric saw blade must be operating at what speed before it contacts the material being cut? - ️️Full
Before loading, unlo...
After 463L pallets are positioned on a rollerized trailer, what can you use to secure the pallets to the
trailer? - ✔ ✔ MB-1 chain assemblies and/or tie-down straps
An electric saw blade must be operating at what speed before it contacts the material being cut? - ✔
✔ Full
Before loading, unloading, or unpinning the trolley assemblies, what needs to happen to the trolley stop
plunger? - ✔ ✔ Ensure it is engaged in the appropriate hole
Before using an electric drill, what is the first thing you should do? - ✔ ✔ Make sure the diameter of
the hole to be drilled is within the capacity of the drill
During in-shop maintenance, which equipment provides power to the GFU-7/E ammunition loader
assembly (ALA) ? - ✔ ✔ GFU-8/E
During the loading operation, which of the following steps are not to be accomplished? - ✔ ✔ Side
load binder handles will be secured on the passenger side of the vehicle
Even though TO 11-1-38 has its own safety section, what other publication should you reference for
safely transporting explosive items on base? - ✔ ✔ Defense Explosives Safety Regulation (DESR)
6055.09_Air Force Manual (AFMAN) 91-201
For the latitudinal configuration, where are the rail assemblies positioned on the trailer deck? - ✔ ✔
Perpendicular to the trailer deck
How is the yaw positioning from the cradle or boom controls of an MJ-1 lift truck adjusted? - ✔ ✔
Manually
How many different rail configurations can the aluminum rail set be assembled on the trailer deck? - ✔
✔ Six
How many openings (hinged door panels) are on the deck of the MHU-226 trailer? - ✔ ✔ Three
How many pounds per square inch (psi) of clean, dry air is required at the tool end of the air hose to
ensure the tool is operating safely and efficiently? - ✔ ✔ 90
How many rail conveyors does the munitions assembly conveyor consist of? - ✔ ✔ Four
, How often should the positive locking devices on the doors of munitions transport modules be checked?
- ✔ ✔ After loading, unloading, and periodically between stops
How often should the universal ammunition loading system (UALS) replenisher assemblies be inspected?
- ✔ ✔ Every 90 days when in use and annually when in storage
If you cannot fully close the load-binder handle by hand, - ✔ ✔ adjust the load-binder hooks on the
chain.
In regards to ground transportation, when are nuclear weapons moved by convoy? - ✔ ✔ Every time
weapons are moved
It is a requirement to damage explosives or containers to ensure munitions are secured to the trailer. -
✔ ✔ False
It is a requirement to ensure rail extenders are properly installed and secured with quick-release pins
prior to use. - ✔ ✔ True
Once verified that an item is nuclear certified, how is it identified as such? - ✔ ✔ Positive
identification by a nameplate, label, appropriate markings, or by official documents
Pintle safety locking pins must remain attached to the pintle assembly - ✔ ✔ to prevent an unsecure
pin from coming out and getting lost.
The annunciators displayed on the Fluke 8025-series multimeter are used to distinguish among - ✔ ✔
ohms, kilohms, and megohms.
The following are all good safety practices to follow when using a lifting sling except - ✔ ✔ inspecting
the sling by passing your bare hand over the body of the sling.
The parking brake on the MHU-110/M is applied by - ✔ ✔ pulling either one of two hand levers
located on each side of the front of the trailer.
The primary difference between a bobtail and a pickup truck is the - ✔ ✔ bobtail's back end is
shortened by about one-half.
The purpose of cutting lubricant in most drilling operations is to increase the - ✔ ✔ drilling speed
and the drill bit life.
The purpose of the transport beam beneath the lift arm assemblies on the MJ-1-series lift truck is to - ✔
✔ provide added support and to relieve hydraulic pressure from the lift arms when carrying loads for
long distances.
The rails configured in the longitudinal direction run perpendicular with the trailer deck and are placed
approximately in the front, center, and rear of the trailer. - ✔ ✔ False
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller jackline98. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.