--Put valve in middle & closer to side with less gpm to make the critical head
calculations easier.
5. Size pipe
--Start at a dead end.
, --Work towards the water source.
--Don't size a pipe unless everything downstream has been sized.
--Make mainlines 1" or larger
6. Check Critical Head
--L. F. D. 100. I. A. (Ladies Fall Down 100x In Abeline)
--Length of pipe, Flow, Diameter of pipe, pressure loss per 100', Item loss,
Accumulated loss
--LFD. Use Design
--100. Uses Reference Charts
--I. Use #s from LFD & 100 for Item loss.
--A. Add losses from I.
--Other Equations. Use DP (Design Pressure) & AHP (Actual Head Pressure) to
determine if the zone works.
7. Schedule
--Determine precipitation rate
Densogram - ANSWER-Graphic view of precipitation to check uniformity.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller NursingTutor1. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.49. You're not tied to anything after your purchase.