100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Questions And Answers Rated 100% Correct $7.99   Add to cart

Exam (elaborations)

DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Questions And Answers Rated 100% Correct

 2 views  0 purchase
  • Course
  • DBIA: Principles of Design-Build and Post Award &
  • Institution
  • DBIA: Principles Of Design-Build And Post Award &

Cooperative Contracting model that is characterized by collaboration and aligning values, goals and objectives amongst owner, architect and contractor. Shares Risk among all participants. - ️️Alliance Contract A breach of contract remedy used when the subject is very unique and the party mus...

[Show more]

Preview 2 out of 11  pages

  • October 11, 2024
  • 11
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • DBIA: Principles of Design-Build and Post Award &
  • DBIA: Principles of Design-Build and Post Award &
avatar-seller
ACADEMICMATERIALS
DBIA: Principles of Design-Build and
Post Award & Contracts, Project
Delivery
Cooperative Contracting model that is characterized by collaboration and aligning
values, goals and objectives amongst owner, architect and contractor. Shares Risk
among all participants. - ✔️✔️Alliance Contract

A breach of contract remedy used when the subject is very unique and the party must
perform contract obligations under the contract. Example: Steel made specifically for
one job site. - ✔️✔️Specific Performance

Maintains control of budget and design process between major estimate phases -
✔️✔️Trend estimating

Fastest Project Delivery method, fast tracking possible overlapping design with
construction utilizing incremental packages. - ✔️✔️Design Build

Procurement Method - Common for A/E - ✔️✔️Negotiated (Qualifications Based)

Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual
cost plus a fee only up to a certain amount. - ✔️✔️GMP (Guaranteed Maximum Price)

Contract Format - cost per piece - ✔️✔️Unit Price

Successful Design Build requires _____ & _______ between participants - ✔️✔️Trust,
Flexibility

Singular responsibility for both design & construction was first made into a building code
by ____ - ✔️✔️Hammurabi

Owner provided items such as 20% design or more and provides prescriptive specs at
RFP. - ✔️✔️Bridging Documents

Single point of responsibility for both design & construction is an attribute of what
delivery method? - ✔️✔️Design Build

The process of checking milestones along the way for completeness. -
✔️✔️Substantiation

, Owner requiring specific products or methods be instituted by DB team in order to
achieve desired performance. - ✔️✔️Prescriptive

T/F Detailed estimating is the Building systems approach to estimating - ✔️✔️False

T/F feasibility estimate is cost model and establishes budget for project - ✔️✔️False

T/F key element of quality assurance is keeping communication lines open between
owner and DB - ✔️✔️True

T/F in Design/cost relationship of DB, the constructor establishes design parameters for
architect - ✔️✔️True

T/F trust is most important thing for DB - ✔️✔️False

DB estimating sequence where 15%-20% of design is completed - ✔️✔️Schematic
estimating

Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation
existed allowing Design-Build. What Year? - ✔️✔️Clinger Cohen Act/Defense
Procurement Reform Act 1996

The level of quality that any average Design Professional would be able to perform
given the circumstances. - ✔️✔️Standard of Care


Provides baseline budgets and schedules and list estimate trends - ✔️✔️Trend logs

What is NOT a design managers role? - ✔️✔️Coordinating owner design reviews and
approvals

Who is responsible for ensuring quality assurance? - ✔️✔️Design Build Team

Awarded to proposer with highest combined total points of technical and price proposals
- ✔️✔️Weighted criteria

Estimate provided with very little design - ✔️✔️Conceptual estimating


Owner proforma based on sq ft or ROM estimates - ✔️✔️Feasibility estimate

Determines if proposer is qualified for project with yes or no statement -
✔️✔️Statement of qualifications

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICMATERIALS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart