100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ANSI/AAMI ST79: 2024 Questions And Answers With Verified Solutions 100% Correct!!! $11.49   Add to cart

Exam (elaborations)

ANSI/AAMI ST79: 2024 Questions And Answers With Verified Solutions 100% Correct!!!

 10 views  0 purchase
  • Course
  • AAMI
  • Institution
  • AAMI

ANSI/AAMI ST79: 2024 Questions And Answers With Verified Solutions 100% Correct!!!

Preview 1 out of 3  pages

  • October 11, 2024
  • 3
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • what should be done afte
  • AAMI
  • AAMI
avatar-seller
classhub
ANSI/AAMI ST79: 2024 Questions And
Answers With Verified Solutions 100%
Correct!!!
Release criteria for non implants - ANSWER✔✔Load release should be an active
decision that is based on evaluation of all available data from sterilization process
for the particular load. Loads that do not meet the criteria for release should be
clearly identified so that they are not mistakenly distributed.


Release criteria for implants - ANSWER✔✔The load should be quarantined until
the results of the BI testing are available. Releasing implants before the BI results
are known is unacceptable and should be the exception. It could be necessary to
release an implantable device before the BI results are known. In this case, the
release of the device before the BI results are known should be documented; it is
critical that this documentation be fully traceable to the patient.


Major repair to a sterilizer - ANSWER✔✔A major repair to the sterilizer is a
repair outside the scope of normal maintenance, such as weld repairs of the
pressure vessel; replacement of the chamber door, vacuum pump, or a major piping
assembly; or rebuilds or upgrades of controls.


Sterilizer preventive maintenance - ANSWER✔✔Normal preventive maintenance,
such as the rebuilding solenoid valves or the replacements gaskets.


What should be done after a major repair of a sterilizer? - ANSWER✔✔3
consecutive test cycles with a PCD containing a BI and 3 Bowie-Dick test cycles.
All must be done in an empty chamber.


Major repair of or changes to the utilities (e.g., the installation of new boilers)
should treated like? - ANSWER✔✔Should be treated as a major repair.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller classhub. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart