Exam (elaborations)
AIC EXAM Study questions with answers
AIC EXAM Study questions with answers
[Show more]
Preview 4 out of 60 pages
Uploaded on
October 12, 2024
Number of pages
60
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Institution
AIC
Course
AIC
$15.49
Also available in package deal from $40.17
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
Also available in package deal (1)
1. Exam (elaborations) - Aic exam study questions with answers
2. Exam (elaborations) - Practice test aic study guide questions with answers
3. Exam (elaborations) - Aic exam with answers
4. Exam (elaborations) - Aic 301 study guide questions with answers
5. Exam (elaborations) - Aic 301 - final exam prep questions with answers
6. Exam (elaborations) - Aic 301 quiz test study questions with correct answers.
Show more
AIC EXAM Study questions with
answers
What |would |be |the |most |appropriate |means |for |the |contractor |to |communicate |to
|the |project |owner |an |unforeseen |condition |not |identified |in |the |soils |report?
A. |Document |the |issue |in |the |job |diary
B. |Issue |a |jobsite |memorandum
C. |Draft |a |construction |report
D. |Write |a |formal |business |letter |- |correct |answers✔✔D. |Write |a |formal |business
|letter
When |is |the |best |time |to |distribute |the |working |agenda |to |the |participants |of |a
|meeting?
A. |As |a |follow-up |to |the |meeting
B. |At |the |beginning |of |the |meeting
C. |About |one |day |after |the |meeting |
D. |About |one |day |prior |to |the |meeting |- |correct |answers✔✔D. |About |one |day |prior
|to |the |meeting
The |contractor |has |tasked |his |project |engineer |with |developing |an |agenda |for |a
|preconstruction |meeting |with |the |architect |and |owner. |The |project |engineer |has
|received |numerous |emails |and |RFIs |from |subcontractors |and |vendors |requesting |a
|wide |range |of |information. |Which |document |is |most |appropriate |to |distinguish
|between |appropriate |topics |for |the |meeting |and |topics |better |addressed |through
|other |means?
A. |General |conditions
B. |General |requirements
C. |Technical |specifications |
D. |Supplementary |conditions |- |correct |answers✔✔B. |General |requirements
What |is |the |best |time |to |distribute |the |meeting |minutes |to |the |participants?
,A. |At |the |beginning |of |the |meeting
B. |About |one |day |after |the |meeting |
C. |About |one |hour |prior |to |the |meeting |
D. |About |one |day |prior |to |the |meeting |- |correct |answers✔✔B. |About |one |day |after
|the |meeting
Which |of |the |following |statements |is |true |about |the |use |of |texting |as |a |means |of
|communicating |in |the |construction |industry?
A) |means |of |easily |and |effectively
documenting |communication
B) |Appropriate |for |clarifying |but |not |for
formal |direction
C) |Should |be |completely |avoided |in
construction
D) |Acceptable |for |communication |if
specifically |allowed |in |the |contract |- |correct |answers✔✔B) |Appropriate |for |clarifying
|but |not |for |formal |direction
A |subcontractor |identifies |a |significant |discrepancy |between |the |architectural |and
|structural |drawings. |The |subcontractor |immediately |meets |with |the |general
|contractor |at |their |construction |trailer |to |discuss |the |discrepancy. |The |general
|contractor |agrees |that |this |could |be |a |significant |change |depending |on |which |of |the
|drawings |describes |the |designer's |intent. |Which |of |the |following |actions |is |the |most
|appropriate |in |this |situation?
A) |Draft |a |change |order |proposal |and |arrange |a |meeting |with |the |design |team |and
|owner |to |resolve |the |conflict.
B) |Draft |an |RFI |that |describes |the |discrepancy |in |detail |and |submit |it |to |the
|architect |immediately.
C) |Send |a |short |text |alerting |the |design |team |of |the |issue |and |discuss |the
|discrepancy |in |detail |at |the |next |meeting.
D) |Email |the |engineer |of |record |to |collect |relevant |background |information |and
|follow |up |with |a |formal |RFI |to |the |architect |- |correct |answers✔✔B) |Draft |an |RFI
|that |describes |the |discrepancy |in |detail |and |submit |it |to |the |architect |immediately.
,What |are |the |leadership |skills |needed |to |conduct |a |productive |meeting?
A) |Planning, |probing |questions, |responding |critically, |and |decision |making
B) |Planning, |timing, |coordinating, |probing,
responding |critically, |and |following |up
C) |Listening |attentively, |responding
constructively, |soliciting |all |ideas, |and |matching |decision |making |to |the |situation
D) |Coordinating, |listening |selectively, |responding |critically, |soliciting |supportive
|ideas, |and |adjusting |decision |making |to |the |situation |- |correct |answers✔✔C)
|Listening |attentively, |responding
constructively, |soliciting |all |ideas, |and |matching |decision |making |to |the |situation
Which |of |the |following |statements |made |by |the |indicated |parties |below |would |least
|likely |be |made |at |an |owner/architect/contractor |progress |meeting?
A) |Contractor: |"There |are |14 |unanswered |RFIs |on |the |log."
B) |Superintendent: |"A |third |party |inspector |will |assist |the |supervision |of |the |roofing
|installation."
C) |Owner: |"It |is |very |likely, |that |change |order |proposal |#23 |will |be |accepted."
D) |Project |manager: |"The |bond |rate |for |ABC |subcontractor |is |1.45%" |- |correct
|answers✔✔D) |Project |manager: |"The |bond |rate |for |ABC |subcontractor |is |1.45%"
What |is |a |listener's |retention |percentage |of |an |oral |conversation?
A. |10%
B. |50%
C. |60% |
D. |90% |- |correct |answers✔✔A. |10%
Which |of |the |following |communication |methods |is |the |most |effective |way |to |know
|that |the |communication |has |been |understood?
A) |The |sender |should |ask |closed-ended |questions |and |tell |the |receiver |twice. |
B) |The |sender |should |ask |open-ended |questions |and |make |them |speak.
C) |The |sender |should |ask |how |they |feel |and |their |attitude |toward |the |activity. |
, D) |The |sender |should |tell |them |what |to |do |and |get |them |back |to |work |quickly. |-
|correct |answers✔✔B) |The |sender |should |ask |open-ended |questions |and |make |them
|speak.
Which |of |the |following |is |the |best |example |of |an |open-ended |question?
A) |Do |you |understand |what |work |is
supposed |to |be |completed?
B) |Do |you |know |which |shovel |to |get |me
from |the |tool |shed?
C) |What |steps |are |you |going |to |take |to
complete |the |activity?
D) |How |do |you |feel |about |completing |the
activities |assigned? |- |correct |answers✔✔C) |What |steps |are |you |going |to |take |to
|complete |the |activity?
Which |of |the |following |statements |about |the |following |organizations |and |their
|justifications |of |its |use |is |most |appropriate |when |designers |develop |project
|specifications?
A) |Organize |building |materials |by |International |Building |Code |chapters |to |facilitate
|inspections |by |the |authority |having |jurisdiction.
B) |Only |use |materials |tested |by |Underwriters |Laboratories |to |ensure |the |highest
|quality |and |lowest |flame |spread |rating.
C) |Use |the |Construction |Specification |Institute's |organizational |system |for
|categorizing |construction |materials |into |divisions |and |sections |as |it |is |widely |used
|by |the |industry.
D) |Use |products |endorsed |by |the |American |Society |for |Testing |Materials |to |prevent
|the |likelihood |of |structural |failure. |- |correct |answers✔✔C) |Use |the |Construction
|Specification |Institute's |organizational |system |for |categorizing |construction
|materials |into |divisions |and |sections |as |it |is |widely |used |by |the |industry.
Assume |you |have |a |simple |beam |16 |ft |long |supported |on |each |end |by |R1 |and |R2.
|There |is |a |concentrated |load |of |900 |lb |that |is |4 |ft |from |R2. |Reaction |R1 |is |pinned
|12 |ft |from |the |load. |Reaction |R1 |is |225 |lb |and |R2 |is |675 |lb. |What |is |the |maximum
|bending |moment |in |pounds |per |foot?
A. |900 |