2a Hoisting license Questions With Solutions
Dot stands for Department of transportion
When do you do your walk around of the equpiment Before you start it
In the one to one sloping ratio what does the 2nd one represent Depth or verticle rise
On a track machine the gears should be where In the ...
When do you do your walk around of the equpiment Before you start it
In the one to one sloping ratio what does the 2nd one represent Depth or verticle rise
On a track machine the gears should be where In the rear
When load leveling when do you deploy your stablizers Before you make the lift
When backfilling an excavation you should use a Small lift , shade the ditch
In the state of MA what criteria require a hoisting license More than 500lbs
Height greater than 10ft
Bucket bigger than 1/4 yard
, 2a Hoisting license Questions With Solutions
What tyoe of saftey system isnused on de-energized circuts Lockout tag out total de
energization
In what time should you contact departmant of public safety if a death occurs Withen one
hour
How many lbs in 1 ton 2000
All welding and cutting on hoistinf equipment shall be done in accoradance with the requirments
of what Aws Asme codes
What items should be checked on a daily basis Fluid levels, hoses tires belts horn backup
system brakes and controls
What action does a signal person intend the operator to preform if he extends his arm at shoulder
height makes a fist with his hands and sticks his thumb up Boom up
What type of protections should be given to operators Protection from weather
Saftey glass
, 2a Hoisting license Questions With Solutions
Heat in cold weather
Over head protection
What law governs hoisting equipment in state of ma Chapter 146 of general laws 530 cmr
section 6
How do you test the load brake on a LULL Lift the load just off the ground and return the
boom handle to the neutral postion
How do you find the weight of a load Shipping papers
Data tags
Use a scale
Calculate weight
What must be stamped on all load rating plates Serial number of unit
The boom of the unit you are operating comes in contact with an energized power line theres no
sign of any other danger such as fire what should you do Stay in cab until lines are de
energized
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller UpperClass. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $19.99. You're not tied to anything after your purchase.