100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
EXAC 2024 - Exam 1 Questions with Solutions $13.99   Add to cart

Exam (elaborations)

EXAC 2024 - Exam 1 Questions with Solutions

 7 views  0 purchase
  • Course
  • EXAC
  • Institution
  • EXAC

Exam of 26 pages for the course EXAC at EXAC (EXAC 2024 - Exam 1)

Preview 3 out of 26  pages

  • October 15, 2024
  • 26
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • EXAC
  • EXAC
avatar-seller
Dreamer252
EXAC 2024 - Exam 1

What does a functional program respond to - client - answer Needs and objectives,
facility availability requirements, space needs

What does a functional program respond to - design - answer scope, site
requirements/availabilities, spatial relationalities

Who is involved in functional programming - answer Client and Architect, jointly

Site requirements to consider during programming - answer parking, circulation,
orientation, accessibility, services

Financial requirements to consider during programming - answer Projected cash flow,
life cycle costs, preliminary budget, procurement

True or False: Programming is a basic architectural service - answer False - it is
typically an additional service

Information to gather during programming: - answer-Users and their activities, occupant
loads, organization, hours of use, storage and support spaces
-Gross-up factor applied to functional areas: mech/elec, circulation, structure, cores etc.
-volumes of activity planned
-precedents and similar buildings

Considerations to document during programming: - answer Critical dims of
furniture/equipment
-Durability and maintenance of finishes, furnishings, etc.
-environmental needs
-hardware requirements for IT/AV

Strategies to aggregate info for programming: - answer-Research and observe
-interviews and consultations
-focus groups
-questionnaires/surveys

Ratio of net vs. gross programmable space efficiency for a condo? - answer ideally 85%
+

Ratio of net vs. gross programmable space efficiency for a typical building? -
answer70%-85%

,Where would the net vs. gross programmable space ratio be low but the building is still
considered efficient - answer Places like hospitals where large corridors and service
spaces are partially-programmed

Physical site characteristics - answerClimate, topography, soil, haz mats,
neighbourhood, and site services

Legal site characteristics - answerlegal title, survey, easements, restrictions, permitted
uses, height and size restrictions, accessibility, site plan control/neighbourhood
character, remediation requirements, historical, floodway/seismic requirements

True or False: a project might be abandoned if costs to accommodate preliminary
programming requirements are too high - answerTrue - but identifying this as early as
possible can help the client decide whether they want to re-assess programming needs,
phasing options, financing, etc.

One of the top priorities of programming? - answerSize of the building

True or False: Begin thinking about "green building" standard targets as early as
programming - answerTrue

What kind of service is Site-Analysis - answerPre-Design Service. It includes evaluating
existing or potential sites in relation to the program, budget, and schedule

Is Site Analysis a basic service? - answerNo, it is additional, unless baked into the
contract ahead of time.

Why is site analysis important? - answerDetermine the obstacles the project might face
during construction, operation, etc.

True or False: You might need to tear open a wall to properly perform a Building
Condition Assessment - answerFalse - typically just remote sensing devices are used
for this.

What is Facility Condition Index (FCI)? - answerRatio of total maintenance, repair and
replacement costs required against the cost to replace the entire building completely

Distinguish between "As-built" and "As-found" drawings - answerAs-built = contractor
drawings submitted after building is completed for record drawings
As-found = drawings of building provided by owner, could be sketchy, not always
accurate to reality

Cultural aspects of a site - answerFormer uses (anything hazardous? Remediation?
Burial site?), present zoning and restrictions, type of land ownership, land use patterns,
location and availability

, What constitutes the site description? - answerAddress, orientation, appearance,
climate, availability of utilities, permitting requirements by AHJs, access to municipal
services

Environmental factors of a site - answerprevailing winds, solar orientation, temperature
and humidity, physical features, views, vegetation (protected species?!),
vehicle/pedestrian access, neighbourhood structures, smells and noises

Water considerations of a site - answerExisting bodies of water, access to quality /
potable water, drainage, subsurface and surface waterway easements, flood
considerations

Former site uses to beware of? - answerHazardous dumping, landfill, old foundations,
burial sites, history of existing structures, zoning effects, type of land ownership, land
use patterns, community services available

Main difference between master planning and urban planning? - answerMaster planning
is high level only, whereas urban planning studies all scales

What's an ESA? - answerEnvironmental Site Assessment

Which ESA phase is characterized by office-based review of existing paperwork and
available info? - answerESA Phase 1

What is ESA Phase 2 about? - answerIn the first phase of environmental site
assessment, concerns were raised that required site visit for some drilling and sending
materials to lab for analysis

What is ESA Phase 3 about? - answerIt's about documenting contaminants detected on
site during lab testing + plan to remediate!

Is Silica a hazardous material commonly found on sites? - answerApparently yes!

What are concerns about ground slopes on sites that are 25%+? - answerSubject to
erosion and hard to build on

What kind of slope (approx)would expensive, but not impossible to build on, and hard to
run around on? - answer10% slope

What's the ideal slope of a site for building practicality? - answerunder 5%

Where does groundwater come from?? - answerIt's mainly surface water that seeped in

Give examples of subsurface drainage systems - answerunderground piping, sewer,
natural openings at lower elevations

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Dreamer252. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62555 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart