The large-scale adoption of the business computer led to a new form of drafting called
___.
Select one:
a. Building Information Modeling (BIM)
b. Computer-Aided Drafting (CAD)
c. Blue Beam
d. Design CAD – answer b.
Computer-Aided Drafting (CAD)
Prints are drawn to a scale. Electricians use a(n) ___ scale when reading and
determining measurements on a print.
Select one:
A. architectural
b. digital
c. engineering
d. ratio - answer
Which Master Format® Division is used for electrical specifications?
Select one:
a. Division 26
b. Division 01
c. Division 14
d. Division 44 – answer a.
Division 26
RFP is the acronym for ___.
Select one:
a. Request for Proposal
b. Request for Personnel
c. Request for Products
d. Request for Pricing – answer d.
Request for Pricing
Which schedule is the most important for the electrician?
Select one:
a.the finish schedule
b.the panel schedule
c.the fixture schedule
d.the power schedule - answerb.
the panel schedule
,The ___ plan shows location of lighting fixtures and other equipment, such as air-
handling diffusers, smoke detectors, or sprinkler heads.
Select one:
a.lighting
b.power
c.one-line / riser diagram
d.reflected ceiling plan - answer
The ___ is an isometric view of the distribution system to install from.
Select one:
a.power plan
b.structural plan
c.one-line / riser diagram
d.general plan - answerc.
one-line / riser diagram
It is also important to read the ___ plan to determine where an electrical installation may
be required, such as how close to install a receptacle near a sink.
Select one:
a.structural
b.general
c.lighting
d.mechanical and plumbing - answer
___ are commonly shown on all drawings to provide basic information such as general
references, tasks to be performed, or code conformity.
Select one:
a.General Notes
b.Key Notes
c.Special Notes
d.Information Notes - answera.
General Notes
The ___ plan shows the compass direction of the building.
Select one:
a.floor
b.elevation
c.compass
d.plot - answerd.
plot
The project delivery method where the owner works with the architect/engineers directly
at project start is ___.
Select one:
a.design-bid/build
,b.design-build
c.time and material
d.build-design - answera.
design-bid/build
The project delivery method where the GC is responsible for much of the design is ___.
Select one:
a.design-bid/build
b.design-build
c.time and material
d.build-design - answer
The project delivery method used for change orders or small projects is ___.
Select one:
a.design-bid/build
b.design-build
c.time and material
d.build-design - answer
RFP typically means ___.
Select one:
a.reinforced partition
b.rounded furniture post
c.request from plumber
d.request for pricing/proposal - answerd.
request for pricing/proposal
Costs for additional items not covered in the original construction contract are
authorized by ___.
Select one:
a.change orders
b.word of mouth
c.specifications
d.contract appendices - answera.
change orders
CAD is the acronym for ___.
Select one:
a.computer architecture data
b.computer-aided drafting
c.costly architecture design
d.constant attention to detail - answerb.
computer-aided drafting
Pages within a set of prints are numbered according to the type and convention. What is
an example of a naming convention found within a set of prints?
BIM is the acronym for ___.
Select one:
a.Build-Integrate-Manufacture
b.Best in Manufacturing
c.Builders Information Modeling
d.Building Information Modeling - answerd.
Building Information Modeling
Drawing standards for symbols have been developed by ___.
Select one:
a.OSHA
b.ASHRAE
c.ANSI
d.ASTM - answerc.
ANSI
What kind of notes relate to an entire sheet or set of drawings?
Select one:
a.key notes
b.spec notes
c.footnotes
d.general notes - answerd.
general notes
What kind of notes relate to specific items on a drawing?
Select one:
a.key notes
b.spec notes
c.footnotes
d.general notes - answera.
key notes
What are the scale types found on drawings?
Select one:
a.Electrical/Mechanical
b.Architectural/Engineering
c.Architectural/Electrical
d.General/Engineering - answerb.
Architectural/Engineering
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.49. You're not tied to anything after your purchase.