100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide $8.99   Add to cart

Exam (elaborations)

NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide

 0 view  0 purchase
  • Course
  • Nccco
  • Institution
  • Nccco

NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide

Preview 3 out of 20  pages

  • October 16, 2024
  • 20
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Nccco
  • Nccco
avatar-seller
nursehailey
NCCCO Core Exam | Practice Questions
and Answers Graded A+ | 2024/2025
Guide

What is most important when determine the capacity of the jib?
- Correct Answer - Angle


Running ropes should be removed from service if there are______ randomly
distributed broken wires in a lay or______ broken wires in a strand in a lay
- Correct Answer - 6,3


Rotation resistant ropes should be removed from service if there are______
broken wires and six rope diameters or_____ broken wires in 30 rope
diameters
- Correct Answer - 2,4


According to OSHA, what is the removal criteria for Standard running rope to
be taken out of service?
- Correct Answer - Six broken wires in a lay


Standing ropes should be removed from service if there are more than____
broken wire in a rope Lay at the end connections or more than_____ broken
wires in a rope lay Beyond the end connections.
- Correct Answer - 1,2

,What would call for a rotation resistant rope to be taken out of service?
- Correct Answer - 2 Broken wires and 6 rope diameters


OSHA requires a distance be maintained from powerline when the voltage is
unknown but under 350 KV
- Correct Answer - 20 ft


What is minimum distance for a crane operations around powerlines up to 50
KV? - Correct Answer - 20ft


What is minimum distance for a crane operations around powerlines up to 50
KV? - Correct Answer - 6 ft


The site supervisor and the lift Director can be the same person?
- Correct Answer - True


No lift must be made on the cranes other hoist when hoisted personnel
- Correct Answer - True


If the cranes operator does not recognize the signal, the operator should
- Correct Answer - Stop


When lifting a load over the side, the crane operator should use the_______
Chart - Correct Answer - 360 degrees chart

, If using a 1 inch wire rope sling to basket around a 4 inch pipe. What is the DD
ratio used for determine how much capacity can be lost
- Correct Answer - 4/1


What is the minimum distance for a crane operations around the powerline up
to 50 KV? - Correct Answer - 10 ft


What is the minimum distance around powerlines with the boom and transit
position while driving under powerlines?
- Correct Answer - 4 ft


What is the minimum distance for a crane operations around powerlines that
are 720 KV? - Correct Answer - 35 ft


What is the minimum distance around powerlines with boom in transit position
while driving under power lines and voltage is 350 KV
- Correct Answer - 16 ft


What is the minimum distance for crane operations around powerlines that are
150 KV? - Correct Answer - 15 ft


What is the minimum distance around powerlines with boom in transit
positions while driving under powerlines if voltage is 40 KV?
- Correct Answer - 6 ft


What is the minimum distance for crane operations around powerlines that are
800 KV? - Correct Answer - 45 ft

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller nursehailey. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79978 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$8.99
  • (0)
  Add to cart