Exam (elaborations)
EXAC EXAM LATEST QUESTIONS WITH COMPLETE SOLUTIONS.
EXAC EXAM LATEST QUESTIONS WITH COMPLETE SOLUTIONS.
[Show more]
Preview 2 out of 14 pages
Uploaded on
October 18, 2024
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Institution
EXAC
Course
EXAC
$12.49
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
EXAC EXAM LATEST QUESTIONS WITH
COMPLETE SOLUTIONS
How hhmuch hhliability hhinsurance hhis hhan hharchitect hhrequired hhto hhhave? hh- hhAnswer
hhDepends hhon hhthe hhprovince, hhIn hhAlberta hhthere hhis hhno hhrequirement.
What hhresources hhare hhavailable hhto hhan hharchitect hhto hhproduce hha hhproject hhcost
hhestimate? hh- hhAnswer hhQuantity hhSurveyors
Construction hhManagers
Construction hhPrice hhIndex
Publications hh- hhfrom hhgov, hhcompanies, hhinterest hhgroups
CHOP hh2.3.3
What hhare hhthe hhEconomic hhand hhPolitical hhfactors hhthat hhcan hhinfluence
hhconstruction hhcosts? hh- hhAnswer hh• hhInflation
• hhMarket hhconditions
• hhInterest hhrates
• hhFlux hhin hhsupply hhand hhdemand
CHOP hh2.3.3
What hhare hhthe hhEnvironmental hhfactors hhthat hhcan hhinfluence hhconstruction hhcosts?
hh- hhAnswer hh• hhSite hhcharacteristic
• hhWeather
• hhLocation
CHOP hh2.3.3
What hhare hhthe hhOwner/Client hhcharacteristics hhthat hhcan hhinfluence hhconstruction
hhcosts? hh- hhAnswer hhdesign hhrequiring hhhigh hhstandards hhof hhquality hhor
rigorous hhquality hhcontrol hhprocedures
(especially hhlong hhlife hhcycle, hhredundancies hhin
spaces);
complex hhbidding hhprocedures;
insurance hhrequirements hhabove hhthe hhnorm;
extensive hhbonding hhrequirements;
poorly hhwritten, hhsometimes hhinequitable,
non-standard hhcontract hhwording;
long hhdelays hhin hhissuing hhpayments hhto hhcontractors.
CHOP hh2.3.3
What hhare hhthe hh4 hhmethods hhof hhconstruction hhcost hhestimation? hh- hhAnswer
hhElemental
Area hh(Cost hhper hhm2/per hhft2)
, Volume hh(Cost hhper hhm3)
Unit hhUse hh- hh(Cost hhper hhbed, hhcost hhper hhseat, hhetc.)
What hhdoes hha hhprogressive hhreleasing hhof hhhold hhbacks hhmean? hh- hhAnswer hhIt
hhmeans hhthat hhcertain hhsubcontractor hhhold hhbacks hhmay hhbe hhreleased hhin
hhadvance hhof hhsubstantial hhperformance, hhcertifying hhthem hhas hhcomplete.
List hh5 hhexamples hhof hhadditional hhservices hhnot hhlisted hhas hhbasic hhunder hhRAIC
hhDoc hh6 hh- hhAnswer hh1. hhfinancial hhfeasibility hhstudies, hh
2. hhbusiness hhcases
3. hhpreparing hhfunctional hhprograms
4. hhsubmissions hhto hhauthorities
5. hhlife hhcycle hhcost hhstudies.
CHOP hh2.1.10
What hhBuildings hhRequire hhthe hhservices hhof hhan hhArchitect hh- hhAnswer hh(a) hha
hhbuilding, hh3 hhstoreys hhor hhless hhin hhheight, hhfor hhassembly
occupancy hhor hhinstitutional hhoccupancy hhthat,
hh(i) hhin hhthe hhcase hhof hha hhsingle hhstorey hhbuilding, hhhas hha hhgross hharea hhof
300 hhsquare hhmetres hhor hhless, hh
hh(ii) hhin hhthe hhcase hhof hha hh2 hhstorey hhbuilding, hhhas hha hhgross hharea hhof hh150
square hhmetres hhor hhless hhon hheach hhfloor, hhor
hh(iii) hhin hhthe hhcase hhof hha hh3 hhstorey hhbuilding, hhhas hha hhgross hharea hhof hh100
square hhmetres hhor hhless hhon hheach hhfloor;
hh(b) hha hhbuilding hhfor hhresidential hhoccupancy hhthat
hh(i) hhis hha hhsingle hhfamily hhdwelling, hhor
hh(ii) hhis hha hhmultiple hhfamily hhdwelling hhcontaining hh4 hhdwelling hhunits
or hhless;
hh(c) hha hhbuilding, hh3 hhstoreys hhor hhless hhin hhheight, hhfor hhresidential
occupancy hhas hha hhhotel, hhmotel hhor hhsimilar hhuse hhthat,
hh(i) hhin hhthe hhcase hhof hha hhsingle hhstorey hhbuilding, hhhas hha hhgross hharea hhof
400 hhsquare hhmetres hhor hhless,
hh(ii) hhin hhthe hhcase hhof hha hh2 hhstorey hhbuilding, hhhas hha hhgross hharea hhof hh200
square hhmetres hhor hhless hhon hheach hhfloor, hhor
hh(iii) hhin hhthe hhcase hhof hha hh3 hhstorey hhbuilding, hhhas hha hhgross hharea hhof hh130
square hhmetres hhor hhless hhon hheach hhfloor;
hh(d) hha hhbuilding, hh3 hhstoreys hhor hhless hhin hhheight, hhfor hhwarehouse,
business hhand hhpersonal hhservices hhoccupancy, hhfor hhmercantile
occupancy hhor hhfor hhindustrial hhoccupancy hhthat
hh(i) hhin hhthe hhcase hhof hha hhsingle hhstorey hhbuilding, hhhas hha hhgross hharea hhof
500 hhsquare hhmetres hhor hhless,
hh(ii) hhin hhthe hhcase hhof hha hh2 hhstorey hhbuilding, hhhas hha hhgross hharea hhof hh250
square hhmetres hhor hhless hhon hheach hhfloor, hhor
hh(iii) hhin hhthe hhcase hhof hha hh3 hhstorey hhbuilding, hhhas hha hhgross hharea hhof hh165
square hhmetres hhor hhless hhon hheach hhfloor;
hh(e) hha hhbuilding hhthat hhis hha hhfarm hhbuilding hhnot hhfor hhpublic hhuse;