CDT Practice Delivery study Guide questions with complete solutions

Preview 2 out of 14  pages

  • October 19, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CDT
  • CDT
avatar-seller
Lectphilip
CDT Practice Delivery study Guide
questions with complete solutions
m2-Which of the following is not a construction schedule milestone: a) submittal approval b) Project
Delivery and team selection process c) Procurement (Bidding/negotiating/purchasing) Activities. d)
Contract Completion - correct answer-Project Delivery and team selection process



m6-If a date to proceed is not stipulated in the agreement, the owner should issue to the contractor a: -
correct answer-Notice to Proceed



m6-Pre-construction Activities Begin when the contractor has receivedL - correct answer-A Letter of
Intent to Award



m6-Which of the following is not a mobilization and Start up cost - correct answer-Royalties, Licenses
and Fees



m6-It is important to establish the site conditions prior to: - correct answer-mobilization



m6-Mobilization typically occurs after: - correct answer-Receipt of a notice to proceed and following a
reconstruction meeting



m6-Which two types of bonds might be required during construction - correct answer-Performance
Bond and Bid Bond



m6-Inspections are done by the AHJ to determine if the construction complies with - correct answer-
Codes and Regulations



m6-The contractor Should being Preparation and Delivery for the Pre-construction Submittals after
which Event - correct answer-Execution of Agreement



m6-Payment and Performance bonds are which type of document - correct answer-Pre-construction
Submittal

, m6-It is important for subcontract and purchase order documents to reference the - correct answer-
contract documents



m6-Which two Parties are responsible for submittal of a set of construction documents tot he AHJ for
permit review - correct answer-Owner and Architect



m6-What is typically the contractor's first activity on the project site - correct answer-Mobilization



m7According to the AIA A201 The contractor has sole responsibility and control over the following
construction activities - correct answer-Means, methods, techniques, sequences, procedures,
coordination, job site safety



m7The responsibility of inspecting work already performed for proper conditions to receive subsequent
work lies with the - correct answer-Contractor



M7- The contractor's superintendent: - correct answer-Can not be changed without the owners consent
and communication is as binding as if given by the contractor



m7- True or False - by executing the contract the contractor confirms that the contract time is
reasonable - correct answer-True



m7- The date of substantial completion is established by the - correct answer-A/E



`m7- Under A201 who has the responsibility to pay sales, consumer, use and similar taxes for the work
provided? - correct answer-contractor



m-7If the contractor is delayed in the progress of the work by the owner the contractor should: - correct
answer-Write the A/E requesting a change order granting an extension of time.



m7- Product equivalency, manufacturer, installation, operating cost, maintenance costs, and warranty
are major factors to be considered for: - correct answer-Substitution Request

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Lectphilip. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart