100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Nicet Level 2: Concrete Structure Construction and Drainage Questions and Answers (Best Reated) $10.49   Add to cart

Exam (elaborations)

Nicet Level 2: Concrete Structure Construction and Drainage Questions and Answers (Best Reated)

 13 views  0 purchase
  • Course
  • Nicet Level 2: Utilities, Incidental Construction
  • Institution
  • Nicet Level 2: Utilities, Incidental Construction

What size lifts should be placed for bedding? 6" lifts When should backfill not be placed next to a structure? When structure hasn't achieved 80% of it structural strength Where does the elevation start on a footing? At the bottom Each layer should be compacted to achieve what maximum dens...

[Show more]

Preview 2 out of 13  pages

  • October 20, 2024
  • 13
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Nicet Level 2: Utilities, Incidental Construction
  • Nicet Level 2: Utilities, Incidental Construction
avatar-seller
ExamArsenal
1 | P a g e | © copyright 2024/2025 | Grade A+




Nicet Level 2: Concrete Structure
Construction and Drainage
Questions and Answers (Best
Reated)
What size lifts should be placed for bedding?


✓ 6" lifts




When should backfill not be placed next to a structure?


✓ When structure hasn't achieved 80% of it structural strength




Where does the elevation start on a footing?


✓ At the bottom




Each layer should be compacted to achieve what maximum density

percentage?


✓ 95%




What should be done to prep bedrock prior to placing footing?


✓ Grout should be placed to fill any voids in bedrock.




Master01 | September, 2024/2025 | Latest update

, 1 | P a g e | © copyright 2024/2025 | Grade A+

How far away should stockpiled material be away from an open excavated

hole?


✓ within 24"




What equipment is used to drive piles?


✓ 1. Gravity Hammers

✓ 2. Open-end and closed end - diesel hammers

✓ 3. Air and steam hammers

✓ 4. hydraulic Hammers




What is the wave equation for driving piles?


✓ between 2 and 10 blows per inch




When pre-boring when should you stop?


✓ within 5 feet of estimated pile tip




When do you check pile alignment?


✓ before the last 5' of the pile is driven




Master01 | September, 2024/2025 | Latest update

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ExamArsenal. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62890 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart