100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
BNSF SESSION 4 EXAM QUESTIONS WITH COMPLETE SOLUTIONS $12.99   Add to cart

Exam (elaborations)

BNSF SESSION 4 EXAM QUESTIONS WITH COMPLETE SOLUTIONS

 5 views  0 purchase
  • Course
  • BNSF SESSION 4
  • Institution
  • BNSF SESSION 4

BNSF SESSION 4 EXAM QUESTIONS WITH COMPLETE SOLUTIONS Most light units are changed upon failure. List those units: - Answer-1. Power off Indicators 2. Highway grade crossing warning systems 3. Wayside signals with automatic downgrades What light unit is changed even if it is still working an...

[Show more]

Preview 2 out of 8  pages

  • October 20, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • BNSF SESSION 4
  • BNSF SESSION 4
avatar-seller
victoryguide
BNSF SESSION 4 EXAM QUESTIONS
WITH COMPLETE SOLUTIONS
Most light units are changed upon failure. List those units: - Answer-1. Power off
Indicators
2. Highway grade crossing warning systems
3. Wayside signals with automatic downgrades

What light unit is changed even if it is still working and how often? - Answer-Wayside
signals without automatic downgrades (every two years)

Where is the one spot that a 25W bulb can never be used? - Answer-Gate arm lights

Is 8.8V to 9.2v acceptable voltage rang for highway grade crossing warning signals? -
Answer-Yes (Not less than 8.5 volts or 85% of the rated voltage)

Which hump yard signal governs train movement from the bowl area to the hump crest?
- Answer-Trim signals

How must the optics in a track side infrared scanner be cleaned? - Answer-With a soft
cloth and anti-fog cleaning solution, water, or manufacturer recommendation

Test of movable rails for surface should be made insuring each rail seat shows whether
or not the rail can be locked or, if electrically checked. whether or not circuit controller
contacts are opened by what obstruction gage and where? - Answer-3/8 on each rail
seat

PTC was designed to prevent and protect certain key pieces what will PTC specifically
protect? - Answer-Roadway workers

What is the temperature of an Absolute alarm according to the detector settings? -
Answer-170 degree

There are three processes that have to be accomplished before an interlocked signal
may display a proceed aspect for a movable bridge. What are the three processes? -
Answer-1. Bridge must be seated then locked
3. moveable rail must be determined to be in proper surface and alignment with the rails
on the abutment or fixed span
4. derails if any must be placed in non-derailing postion

What is considered as the proper coupling speed in the bowl of a hump yard? - Answer-
3-4 MPH

, What is the main function preformed by the process control portion of the yard
computer? - Answer-Route humped cars to the proper class track at the proper coupling
speed

Signal and track employees have four responsibilities outlined in EI-25, what are they? -
Answer-Install, maintain, report and perform audits on signal assets

What is the recommended distance from magnetic center to magnetic center for
transducers? - Answer-24"

When is the bridge considered to be properly locked? - Answer-When its within 1" of
fully driven

At what temperature for an integrity test does a train get an integrity failure? - Answer-0-
100 degrees

PTC was designed to prevent what four key pieces? - Answer-1. Train on Train collision
2. Overspeed derailments
3. movement of a train through an improperly lined switch
4. Train movement past authority limits

There are 5 types of rail joints for movable bridges, what are they? - Answer-1. Mitered
2. Fixed easer
3. Sliding easer
4. Conley 2 piece
5. Conley 3 piece

There are four main components that are required for PTC, what are they? - Answer-1.
Office
2. Communication
3. Locomotive
4. Wayside

There are three types of hardware required for communication of the PTC system, what
are they? - Answer-1. Radio
2. WIU
3. IMG

What is the name of the mechanical device that controls the speed of a car coming of
the crest and rolling towards the bowl tracks? - Answer-Master Retarder

All bridges are tested for locking how often? - Answer-1 year

What is the recommended distance for transducers from top rail? - Answer-1 3/4 +/- 1/8

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller victoryguide. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67163 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart