100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED v4 GA Practice Exam Questions and Answers 100% Solved $11.99   Add to cart

Exam (elaborations)

LEED v4 GA Practice Exam Questions and Answers 100% Solved

 3 views  0 purchase
  • Course
  • LEED Green Associate
  • Institution
  • LEED Green Associate

LEED v4 GA Practice Exam Questions and Answers 100% Solved All of the following are part of the USGBC's policy regarding the use of their officially registered logo, except: A. The logo is provided by the USGBC B. The logo may only refer to a USGBC program or product C. The logo signifies end...

[Show more]

Preview 4 out of 44  pages

  • October 22, 2024
  • 44
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • LEED Green Associate
  • LEED Green Associate
avatar-seller
JOSHCLAY
©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.

LEED v4 GA Practice Exam Questions

and Answers 100% Solved


All of the following are part of the USGBC's policy regarding the use of their

officially registered logo, except:

A. The logo is provided by the USGBC

B. The logo may only refer to a USGBC program or product

C. The logo signifies endorsement by the USGBC

D. All uses of the logo must include a trademark, except when repeated

logos in the same document

E. The USGBC logo is less prominent in a document than the logo of the

user - ✔✔C. The logo signifies endorsement by the USGBC

A mixed use project is proposed with one story or level of residential

apartments over ground floor retail core and shell space. Which LEED

rating system should the team use to certify the project?

A. LEED Homes: Lowrise

B. LEED BD+C: New Construction

,©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.

C. LEED BD+C: Core & Shell

D. LEED Neighborhood Development - ✔✔B. LEED BD+C: New

Construction

The primary project team member responsible for managing the

documentation for a project in LEED Online is known as the

_________________________.

A. LEED Project Analyst

B. LEED Project Assistant

C. LEED Project Ombudsman

D. LEED Project Administrator - ✔✔D. LEED Project Administrator

Which one of the following refers to a way of analyzing the environmental,

social, and local impact of a material or product?

A. Impact cycle assessment

B. Life cycle costs

C. Life cycle assessment

D. Purchasing of ongoing consumables - ✔✔C. Life cycle assessment

Which of the following is not a rapidly renewable material?

A. Wool

B. Teak

,©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.

C. Bamboo

D. Cork - ✔✔B. Teak

Buildings in the US account for what percent of total electricity use?

A. 55%

B. 68%

C. 72%

D. 80% - ✔✔C. 72%

Post-consumer recycled content is:________________.

A. Sourced from residential and commercial waste

B. Sourced from wholesale dealers

C. Sourced from manufacturing waste or by-products

D. Sourced from secondary market distributors - ✔✔A. Sourced from

residential and commercial waste

Buildings in the US account for what percent of municipal solid waste?

A. 60%

B. 55%

C. 45%

D. 30% - ✔✔D. 30%

, ©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.

Which one of the following defines nonpotable water?

A. Water that meets drinking water standards

B. Water that does not meet drinking water standards

C. Greywater that has been treated on site to meet drinking water

standards

D. Rainwater harvesting - ✔✔B. Water that does not meet drinking water

standards

Which of the following are examples of pre-consumer recycled content

products? (Select 3)

A. Concrete with fly ash from coal-fired power plants

B. Metal studs made from scrapped automobiles

C. Particle board made from old shipping pallets

D. Acoustical wall panel made with by-product from a plastic bottle

manufacturing plant

E. Asphalt paving with reprocessed asphalt removed from old parking lot

F. Insulation made of scrap from denim jean manufacturing - ✔✔A, D, F

A. Concrete with fly ash from coal-fired power plants

D. Acoustical wall panel made with by-product from a plastic bottle

F. Insulation made of scrap from denim jean manufacturing

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller JOSHCLAY. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

84146 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart