Which of the following methods of bidding is required on most projects for
which government funds are to be used?
A. Direct
B. Negotiated
C. Invited
D. Public Right Ans - Public
Which of the following project delivery methods always requires preparation
of several individual bid-document packages?
A. Design-Bid-Build
B. Fast Track
C. Design Build
D. Turnkey Right Ans - Fast track
diagram on paper Right Ans - Specifications
In developing a list of bidders for a private project, the architect's role is to
A. select the contractor
B. recommend qualified contractors
C. rank the contractors in order of preference
D. discourage owner-recommended contractors Right Ans - recommend
qualified contractors
A contractor's ability to obtain a performance bond for a specific contract is
determined by the
A. owner
B. architect
C. contractor
D. surety Right Ans - surety
AIA Document A305, Contractor's Qualification Statement, requires which of
the following supplemental documents to be provided by the applicant?
, A. financial statement
B. list of subcontractors
C. list of proposed consultants
D. list of proposed material suppliers Right Ans - Financial statment
After considering all the bids, the owner favors a bid with irregularities.
According to AIA Document A701, Instructions to Bidders, the owner has
which of the following rights/responsibilities regarding an irregular bid?
A. Has the right to waive irregularities and accept the Bid
B. Has the right to extend the bidding period for corrections
C. Must informally request corrections from the bidder
D. Must only consider bids without irregularities Right Ans - Has the right
to waive irregularities and accept the bid
A local bank has a budget of $30,000,000 to construct a new main office. The
bank wants to use contractors who are customers of the bank; however, none
of the bank's contractor customers can bond the entire amount of the
contract. Which of the following delivery methods would be best suited to
meeting the bank's contractor selection goal?
A. Design-Build
B. Fast-Track
C. Multiple-Prime Contracts
D. Additive change Orders Right Ans - multiple prime contracts
Which of the following is an appropriate item for the prebid conference?
A. Occupancy-permit procedures
B. Notification of future addenda
C. Pre-commissioning procedures
D. Status of Change Orders Right Ans - notification of future addenda
A contractor under a fixed-price construction contract has allowed the
electrical subcontractor to install lighting fixtures other than those stated in
the contract documents. The electrical subcontractor and the contractor both
believe the substituted fixtures to be of equal value. The construction is
substantially completed and the architect rejects these fixtures. According to
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.49. You're not tied to anything after your purchase.