DBIA EXAM 1 2024-2025 EXAM
COMPLETE 350 QUESTIONS WITH 100%
DETAILED VERIFIED AND CORRECT
ANSWERS BRAND NEW EXAM ALREADY
GRADED A+
P3 is typically used in what delivery system? -
....ANSWER...DB
The 2 main responsibilities of the owner under ALL
delivery systems: Executing ______; and Executing
actual _____ _____. - .. ANSWER...- procurement
- project delivery
Owner's often retain __ _____ assistance. -
_
1
,....ANSWER...3rd party
What is one characteristic of the scope in 3rd party
assistance? - ....ANSWER...The scope of services varies
widely
Using a 3rd party professional does NOT constitute a
new _____ _____. - ....ANSWER...delivery system
Delivery systems alone, do not predict _____ -
....ANSWER...success
Owners drive project success by strategically
selecting strategies that promote team ________ and
group _____. -.... ANSWER...- integration
- cohesion
What are 3 strategies to maximize integration and group
cohesion? - ....ANSWER...- open-book in cost
- early involvement in design process
- qualification based selection
2
,In DB, the majority of responsibility for completeness,
accuracy, and integration of design and construction
processes is transferred to the
_____ - ....ANSWER...Design-Builder.
DB is a mindset defined by the _____ of everyone
involved in the project. - ....ANSWER...attitude
Success in DB requires the team to think and act as
a _____ _____. - ....ANSWER...single entity
_____ ______ was not a contractor, architect, or engineer;
but the embodiment of all 3. -
....ANSWER...Master-Builder
3
, The DB process is intended to
Traditionally in _____,
be highly ________________________________ and
fully _____. - .. ANSWER...- the price for entire
collaborative contract is
established at
- integrated. execution/award. -
....ANSWER...DB
The power of the _____ will
deliver projects faster, In _____ DB, the Owner
better, and for optimum cost. - defines the project
....ANSWER...team requirements and scope
of prescriptive work. -
....ANSWER...traditional
Intense efforts to establish the
_____ early in the
process can enable big
decisions to be made early Which project delivery
and affect project outcomes method has multiple
at lowest cost. - organizational structures?
....ANSWER...scope - ....ANSWER...DB
Intense efforts to establish In DB, How is the
the scope earlier on in the Design-Builder generally
process, drives early team selected?
______ to include key - ....ANSWER...QBS or
trade _____. - .... ANSWER...- Best Value
formation
- subcontractors Which delivery methods
generally uses the
4
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller EliteExamsPlug. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $15.49. You're not tied to anything after your purchase.