A wall on a drawing with a scale of 1/4" =1-foot measures 5 1/2". How long is the wall in feet? - ANSWER 22' - (5 1/2= 5 2/4 5X4=20 +2 =22')
A line on a drawing is composed of long and short dashes. What is the name of this line? - ANSWER A centerline
Most construction lumber is cut ____ sawn...
A wall on a drawing with a scale of 1/4" =1-foot measures 5 1/2". How long is the wall in feet? - ANSWER
22' - (5 1/2= 5 2/4 5X4=20 +2 =22')
A line on a drawing is composed of long and short dashes. What is the name of this line? - ANSWER A
centerline
Most construction lumber is cut ____ sawn - ANSWER Flat sawn
What is the minimum nominal thickness of the ridge board? - ANSWER 1 inch
How Many jack studs will be required for a 2-2x12 header in an interior bearing wall supporting one floor
only, building width of 28', and a span of 7'-0" - ANSWER 2 Jack stud required
What is the maximum hole that may be cut in a 2X12 nominal floor joist? - ANSWER 4" Inches
What size strap is required if a top plate is notched more than 50% of its width? - ANSWER 16 gage in
thickness and 1 1/2" wide
The end of a wood joist must bear on a wood beam by at least _____inches? - ANSWER 1 1/2
The dimension of fine aggregate in concrete is up to ___ " in diameter and coarse aggregate is larger
than_____". - ANSWER 1/4 for both
Concrete gains most of its strength in how many days? - ANSWER 28 days
In what section of the span of a floor joist is it NOT permitted to cut a notch? - ANSWER Middle third
What material is required for the door of an ash dump cleanout? - ANSWER Ferrous metal or masonry
, A cricket is required when the width of a chimney is greater than _____inches. - ANSWER 30"
In what direction must the access gate of a pool swing? - ANSWER Outwards
What is the minimum ceiling height over a bathtub? - ANSWER 6'-8"
What is the maximum unsupported height of a pier consisting of 12"X16" hollow core blocks filled with
type S mortar? - ANSWER 120"
What is the least outside circular diameter of a handrail? - ANSWER 1 1/4"
Insulation shall have a smoke-developed index not to exceed? - ANSWER Not to exceed 450
From where must a smoke alarm draw its primary power? - ANSWER building wiring
What is the live load of an attic with habitable space? - ANSWER 30 #
What is the required width and height of the egress door?___X___? - ANSWER 32X78
The header is an exterior bearing wall of a building that is 28 feet wide, 50 pound snow load, supports a
roof, ceiling and one center bearing floor. If 3-2X12S are used, what is the allowable span? - ANSWER 8'-
0"
How far into concrete must anchor bolts extend? - ANSWER 7"
What is the maximum height of the backfill for a play masonry foundation wall, 8" high and 8" thick, is
constructed in type GW soil? - ANSWER 5'
, If a footing is 18" wide, what is the maximum width of a foundation wall placed on this footing? -
ANSWER 14"
In Virginia, what are the R Value insulation requirements for the ceiling, wall, and floor. - ANSWER 49, 20,
19
The under-floor space vents must be covered with material with a least dimension of? - ANSWER 1/4"
What is the maximum slump of concrete placed in removable forms? - ANSWER 6"
The end joints of double top plates must be offset at least________? - ANSWER 24"
What's the required clearance of wood siding from the ground before it is required to be preservative
treated ? - ANSWER 6"
What is required to support brick veneer above openings in exterior walls? - ANSWER Lintel
What is the minimum stroke width of site address numbers? - ANSWER 1/2"
What's the predominant background color of a Danger sign? - ANSWER RED
The setback distance is the minimum distance between a ______ and the _____lines? - ANSWER House
and the property line
Mortar must be used within _____ hours after initial mixing when the air temperature is 80 degrees or
higher. - ANSWER 2 1/2 hours
How is the drip edge applied in ration to the underlayment at the rake? - ANSWER Over the
underlayment
What is the thickness of flashing? - ANSWER 0.019"
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Lecchris. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $16.99. You're not tied to anything after your purchase.